Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/100924
Título : | High-Temperature Heat Pumps. Use of high-temperature heat pumps for integration with renewable electrical energy in combination with TES in industrial process heat. |
Autor : | Linares Hurtado, José Ignacio Aguilar Escribano, Ignacio Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) |
Fecha de publicación : | 2025 |
Resumen : | Este Trabajo de Fin de Máster estudia una bomba de calor de alta temperatura (HTHP) basada en un ciclo Brayton inverso con CO₂, diseñada para integrarse con electricidad renovable y almacenamiento térmico en lecho de rocas (TES). El modelo opera en lazo cerrado, sin cambio de fase, e incorpora un regenerador y dos intercambiadores (aire–CO₂ y agua–CO₂), permitiendo suministrar vapor saturado en torno a 150 °C para procesos industriales.
Se analizan configuraciones con el intercambiador aire–CO₂ en baja y alta presión, en función de la temperatura de la fuente. A 20 bar se alcanzan COP de 1,6–1,7 para fuentes < 80 °C, mientras que a 85 bar se prioriza la viabilidad constructiva en temperaturas superiores. El análisis económico, basado en el coste nivelado de calor (LCOH), muestra que para potencias ≥ 6 MWt y 12 h/día se logran valores < 90 €/MWh, competitivos frente al gas natural. El sistema se plantea como una solución modular y escalable para la descarbonización del calor de proceso industrial. This Master’s Thesis evaluates a high-temperature heat pump (HTHP) based on an inverse Brayton cycle with CO₂, integrated with renewable electricity and rock-bed thermal energy storage (TES). The closed-loop model includes a regenerator and two heat exchangers (air–CO₂ and water–CO₂), delivering saturated steam at around 150 °C for industrial process heat. Two configurations are assessed, with the air–CO₂ exchanger on the low- or high-pressure side depending on source temperature. At 20 bar, COP values of 1.6–1.7 are obtained for sources below 80 °C, while at 85 bar constructive feasibility is prioritized for higher temperatures. The economic analysis, through the levelized cost of heat (LCOH), shows that for ≥ 6 MWt and 12 h/day operation, costs below 90 €/MWh are achievable, making the system competitive with natural gas. The proposed HTHP emerges as a modular, scalable solution to support industrial heat decarbonization. |
Descripción : | Máster Universitario en Ingeniería Industrial + Máster en Medioambiente y Transición Energética/Master in Environment and Energy Transition |
URI : | http://hdl.handle.net/11531/100924 |
Aparece en las colecciones: | TFG, TFM (temporales) |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFMAguilarEscribanoIgnacio.pdf | Trabajo Fin de Máster | 1,35 MB | Adobe PDF | Visualizar/Abrir Request a copy |
Anexo1.pdf | Autorización | 153,21 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.