Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/101435
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorRodríguez Villar, Beatriz Gemmaes-ES
dc.contributor.authorMiras González, Diegoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Facultad de Derechoes_ES
dc.date.accessioned2025-07-17T11:28:10Z-
dc.date.available2025-07-17T11:28:10Z-
dc.date.issued2026es_ES
dc.identifier.urihttp://hdl.handle.net/11531/101435-
dc.descriptionGrado en Administración y Dirección de Empresas y Grado en Derechoes_ES
dc.description.abstractEl trabajo analiza el control administrativo de la actividad urbanística en España, centrándose en la tensión entre dos técnicas de intervención: la licencia urbanística, instrumento tradicional de control previo, y la declaración responsable, de eficacia inmediata y verificación posterior. Tras establecer el marco general (el urbanismo como función pública, los principios de legalidad, proporcionalidad y seguridad jurídica) el trabajo examina el régimen jurídico de ambas figuras. La licencia se configura como acto reglado y declarativo, cuya función no es crear derechos sino verificar la conformidad de la actuación con el ordenamiento. La declaración responsable, por su parte, desplaza esa verificación a un momento posterior, trasladando al promotor una carga más intensa de comprobación y de asunción del riesgo jurídico. El núcleo comparativo enfrenta dos modelos autonómicos representativos. La Comunidad de Madrid ha invertido la lógica tradicional: la declaración responsable opera como cláusula general residual para todos los actos no expresamente reservados a licencia, incluyendo la primera ocupación y funcionamiento. El País Vasco, en cambio, mantiene la licencia como cauce ordinario, con espacios muy acotados para la comunicación previa, y conserva la licencia de primera utilización como último filtro de control sobre el edificio terminado. La comparación revela que la diferencia entre ambos sistemas no es de mayor o menor control, sino de distribución temporal del riesgo: Madrid anticipa la eficacia urbanística y posterga parte de la verificación; el País Vasco retrasa la activación del inmueble pero concentra antes la depuración de la legalidad. El trabajo concluye que la mejora del sistema requiere tres elementos combinados: una delimitación material más racional entre ambas técnicas, una Administración mejor dotada y una mayor seguridad jurídica ex ante para los supuestos intermedios.es-ES
dc.description.abstractThe work analyses the administrative control of urban planning activity in Spain, focusing on the tension between two intervention techniques: the urban planning licence, a traditional instrument of prior control, and the responsible declaration, which takes immediate effect and is subject to subsequent verification. After establishing the general framework (urban planning as a public function, and the principles of legality, proportionality and legal certainty) the work examines the legal regime of both instruments. The licence is configured as a regulated and declaratory act, whose function is not to create rights but to verify the conformity of the activity with the legal order. The responsible declaration, in turn, displaces that verification to a later stage, transferring to the developer a more intense burden of self-assessment and assumption of legal risk. The comparative core of the work contrasts two representative regional models. The Community of Madrid has reversed the traditional logic: the responsible declaration operates as a general residual clause for all acts not expressly reserved for licensing, including first occupation and commencement of use. The Basque Country, by contrast, maintains the licence as the ordinary channel, with very limited scope for prior communication, and preserves the first occupation licence as a final administrative check on the completed building. The comparison reveals that the difference between the two systems is not one of greater or lesser control, but of temporal distribution of risk: Madrid advances the urban planning effectiveness of a wide range of acts and defers part of the verification; the Basque Country delays the activation of the property but concentrates the legal review at an earlier stage. The work concludes that improving the system requires three combined elements: a more rational material delimitation between the two techniques, a better-resourced public administration, and stronger ex ante legal certainty mechanisms for intermediate cases.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKDGes_ES
dc.titleEl control administrativo de la actividad urbanística: el régimen de licencias y declaraciones responsables y su impacto en el sector inmobiliarioes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsLicencias, declaración responsable, urbanismo, promoción inmobiliaria.es-ES
dc.keywordsLicences, responsible declaration, urban planning, real estate development.en-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Tamaño Formato  
TFG-Miras González, Diego.pdf1,28 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.