Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/1016
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorBlasco Siegrist, Manuel-
dc.contributor.authorMartínez Caridad, Luis-
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2015-06-15T09:59:44Z-
dc.date.available2015-06-15T09:59:44Z-
dc.date.issued2015-
dc.identifier.urihttp://hdl.handle.net/11531/1016-
dc.descriptionIngeniero Industriales_ES
dc.description.abstractEl presente proyecto tiene como objeto el diseño mecánico y ejecución de una instalación de almacenamiento de hidrocarburos líquidos (gasocentro) en la provincia de Almería. La finalidad del documento presentado a continuación es la obtención de los permisos y certificaciones pertinentes a otorgar por los distintos Organismos Oficiales para poder llevar a cabo la ejecución de la obra, puesta en marcha del gasocentro y el permiso de actividad como distribuidor de hidrocarburos líquidos. El gasocentro está situado en el municipio del Huercal de Almería lindando con la N-340a y próximo a la A-7. La situación del gasocentro permite distribuir hidrocarburos a las poblaciones cercanas de Almería, El Ejido y San Isidro de Nijar entre otras. En el gasocentro se almacena gasóleo B (agrícola) y gasóleo C (calefacción) para su posterior distribución mediante camión cisterna en base a la demanda establecida en el pertinente estudio económico realizado. A la hora del diseño y desarrollo del proyecto se han seguido unos criterios estrictos de integridad técnica, seguridad y economía del proyecto basados en principios de racionalidad, funcionalidad y sencillez constructiva.es_ES
dc.description.abstractThe present Project is focused on the mechanical design and execution of a liquid hydrocarbon storage facility located in the province of Almeria. The purpose of this document is the acquisition of the corresponding permits and compulsory certificates signed by the different Governing Bodies in order to be able to carry out the Project execution and start-up as a liquid hydrocarbon storage and distribution facility. The storage facility is situated in the community of El Huercal de Almeria, adjacent to the N-340a road and in the near proximity of the A-7 motorway. This privileged situation allows the distribution of liquid hydrocarbons to the near cities and villages of Almeria, El Ejido and San Isidro de Nijar among other places. Types B and C gas-oil are stored in the facility for the subsequent distribution by means of a tank truck attending to the demand established in the economic feasibility study carried out. With regards to the design and delivery of the project, strict criteria have been followed; mechanical integrity, safety and economic development based on the general principles of rationality, functionality and building simplicity.es_ES
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoeses_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3321 Tecnología del petróleo y del carbónes_ES
dc.subject332104 Gaseoductoses_ES
dc.titleProyecto mecánico de instalación de gasocentroes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
Aparece en las colecciones: ICAI - Proyectos Fin de Carrera

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
PFC000012.pdfProyecto fin de carrera4,84 MBAdobe PDFVista previa
Visualizar/Abrir
PFC000012 Autorizacion.pdfAutorización1,8 MBAdobe PDFVista previa
Visualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.