Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/105708
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAlonso Alonso, Consolaciónes-ES
dc.contributor.authorAldama Nájera, Cristinaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2025-10-01T07:18:12Z-
dc.date.available2025-10-01T07:18:12Z-
dc.date.issued2026es_ES
dc.identifier.urihttp://hdl.handle.net/11531/105708-
dc.descriptionGrado en Administración y Dirección de Empresas y Máster Universitario en Ingeniería Industriales_ES
dc.description.abstractEste proyecto desarrolla el diseño y análisis de la viabilidad técnica, económica y ambiental de un parque eólico terrestre de 39,6 MW ubicado en Pozuelo (Albacete). El parque está compuesto por seis aerogeneradores Siemens Gamesa de 6,6 MW de potencia unitaria, 170 m de diámetro de rotor y 120 m de altura de buje, alcanzando una producción anual estimada de 118 GWh. El diseño técnico contempla una red interna de media tensión de 30 kV configurada en tres líneas independientes y una subestación elevadora 30/132 kV para la evacuación de la energía hacia la Subestación Rómica. Desde el punto de vista económico, el proyecto requiere una inversión aproximada de 50,6 M€ y presenta resultados favorables, con un VAN de 6,3 M€, una TIR del 7,3 % y un periodo de recuperación de 11 años. Asimismo, permitirá evitar aproximadamente 11.600 tCO₂ al año, contribuyendo a la descarbonización del sistema energético, al desarrollo de las energías renovables y al cumplimiento de los objetivos establecidos en el PNIEC.es-ES
dc.description.abstractThis project develops the design and analysis of the technical, economic, and environmental feasibility of a 39.6 MW onshore wind farm located in Pozuelo (Albacete). The farm consists of six Siemens Gamesa wind turbines, each with a capacity of 6.6 MW, a rotor diameter of 170 m, and a hub height of 120 m, with an estimated annual energy production of 118 GWh. The technical design includes a 30 kV medium-voltage internal grid configured as three independent lines and a 30/132 kV lifting substation for transmitting power to the Rómica Substation. From an economic perspective, the project requires an approximate investment of 50.6 M€ and shows favorable results, with a net present value (NPV) of 6.3 M€, an internal rate of return (IRR) of 7.3%, and a payback period of 11 years. In addition, it will avoid approximately 11,600 tCO₂ per year, contributing to the decarbonization of the energy system, the development of renewable energy, and the achievement of the objectives established in the PNIEC.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-electrotecnica (MII-E)es_ES
dc.titleProyecto de ejecución de un parque eólico terrestreses_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsEnergía, eólica, aerogenerador, potencia, viento, parque eólico, plantaes-ES
dc.keywordsEnergy, wind turbine, power, wind, wind farm, planten-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM - Aldama Nájera, Cristina.pdfTrabajo Fin de Máster11,99 MBAdobe PDFVisualizar/Abrir
Signed_Anexo I Cristina Aldama.pdfAutorización366,15 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.