Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/108499Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.advisor | Martín Serrano, Javier | es-ES |
| dc.contributor.author | Ferreira De la Morena, Rafael | es-ES |
| dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
| dc.date.accessioned | 2026-02-02T14:15:59Z | - |
| dc.date.available | 2026-02-02T14:15:59Z | - |
| dc.date.issued | 2026 | es_ES |
| dc.identifier.uri | http://hdl.handle.net/11531/108499 | - |
| dc.description | Grado en Ingeniería en Tecnologías Industriales | es_ES |
| dc.description.abstract | El presente proyecto pretende diseñar e implementar el sistema completo de climatización para la sala fitness y el recinto de la piscina interior de un centro deportivo ubicado en Badajoz. Debido a las distintas necesidades térmicas de ambos recintos, alta ocupación y demanda de aire exterior para la sala fitness frente al importante control de la humedad en la piscina, se valoran soluciones independientes pero integradas mediante una planta de producción térmica común. El desarrollo del proyecto parte del cálculo de las cargas térmicas de verano e invierno de ambos recintos, conforme al CTE y al RITE. Para la piscina se realiza, además, un balance térmico específico del vaso, considerando las pérdidas por evaporación, convección, radiación, renovación de agua y transmisión. De este balance se obtienen unas pérdidas permanentes del vaso de 83,1 kW y una potencia de puesta en régimen de 90,6 kW, necesaria para el calentamiento inicial del agua del vaso tras el llenado. Para poder cubrir estas necesidades, la solución elegida combina tres equipos principales: una Unidad de Tratamiento de Aire de 18.716 m³/h para la sala fitness; una máquina deshumectadora Sedical DRESY 2111, de 22.000 m³/h y 111,1 l/h de capacidad de deshumidificación, con recuperación de calor hacia el agua del vaso; y una bomba de calor aire-agua de cuatro tubos, con 152,7 kW de potencia frigorífica y 167,3 kW de potencia calorífica, que actúa como producción térmica centralizada. Como apoyo a la piscina en situaciones de puesta en régimen o condiciones desfavorables, se incorpora un intercambiador de placas de 90,6 kW. Finalmente, se dimensionan las redes de conductos de aire y la red hidráulica, y se elaboran los planos, el pliego de condiciones y las mediciones del proyecto. El presupuesto de ejecución material asciende a 220.171,84 €, sin IVA. | es-ES |
| dc.description.abstract | This project aims to design the air conditioning system for the fitness room and the indoor swimming pool area of a sports centre located in Badajoz. Due to the different requirements of both spaces, high occupancy and significant outdoor air demand in the fitness room, versus strict humidity control in the swimming pool area, independent solutions are proposed for each zone, integrated through a common thermal production plant. The development of the project starts with the calculation of the summer and winter thermal loads of both spaces, in accordance with the CTE and the RITE. For the swimming pool, a specific thermal balance of the pool basin is also carried out, considering heat losses due to evaporation, convection, radiation, water renewal and transmission. This balance results in permanent heat losses of the basin of 83.1 kW and a start-up power requirement of 90.6 kW, needed to heat the water after filling. To meet these demands, the adopted solution combines three main pieces of equipment: an Air Handling Unit with a supply airflow of 18,716 m³/h for the fitness room; a Sedical DRESY 2111 dehumidifying unit, with an airflow of 22,000 m³/h and a dehumidification capacity of 111.1 l/h, with heat recovery to the pool water; and a four-pipe air-to-water heat pump, with a cooling capacity of 152.7 kW and a heating capacity of 167.3 kW, acting as the centralised thermal production system. As support to the pool during start-up or unfavourable operating conditions, a 90.6 kW plate heat exchanger is incorporated. Finally, the air duct network and the hydraulic network are dimensioned, and the drawings, technical specifications and measurements of the project are developed. The estimated cost of the installation amounts to €220,171.84, excluding VAT. | en-GB |
| dc.format.mimetype | application/pdf | es_ES |
| dc.language.iso | es-ES | es_ES |
| dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
| dc.subject.other | KTI-mecanica (GITI-M) | es_ES |
| dc.title | Climatización de un centro deportivo | es_ES |
| dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
| dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
| dc.keywords | Climatización, piscina interior, deshumectadora, recuperación de calor ,bomba de calor de cuatro tubos, unidad de tratamiento de aire, intercambiador de placas. | es-ES |
| dc.keywords | Air conditioning, indoor swimming pool, dehumidifying unit, heat recovery, four-pipe heat pump, Air Handling Unit, plate heat exchanger. | en-GB |
| Aparece en las colecciones: | TFG, TFM (temporales) | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| Anexo I - Rafael Ferreira.pdf | Autorización | 272,46 kB | Adobe PDF | Visualizar/Abrir |
| TFG-Ferreira de la Morena, Rafael.pdf | Trabajo Fin de Grado | 8,77 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.