Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/14178
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Latorre Canteli, Jesús María | es-ES |
dc.contributor.author | Cerisola Lopez De Haro, Santiago | es-ES |
dc.contributor.author | Ramos Galán, Andrés | es-ES |
dc.date.accessioned | 2016-10-18T12:05:19Z | - |
dc.date.available | 2016-10-18T12:05:19Z | - |
dc.identifier.uri | http://hdl.handle.net/11531/14178 | - |
dc.description.abstract | es-ES | |
dc.description.abstract | In this paper we present two models to evaluate the hydro scheduling of a multireservoir system. A simulation model based on the object oriented programming paradigm and another multi-objective optimization problem based on traditional mathematical programming tools are described. Both models are evaluated with real sized hydro basins elaborated from the Spanish hydrological system and comparisons between their results are given. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.title | Object oriented simulation and optimization of hydrolectric power systems | es_ES |
dc.type | info:eu-repo/semantics/workingPaper | es_ES |
dc.description.version | info:eu-repo/semantics/draft | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | en-GB | |
Aparece en las colecciones: | Documentos de Trabajo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-06-043A.pdf | 194,45 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.