Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/14229
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorZhao, Quanyues-ES
dc.contributor.authorMorales España, German Andreses-ES
dc.contributor.authorBaldick, Rosses-ES
dc.contributor.authorGarcía González, Javieres-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2016-10-18T12:05:52Z-
dc.date.available2016-10-18T12:05:52Z-
dc.identifier.urihttp://hdl.handle.net/11531/14229-
dc.description.abstractes-ES
dc.description.abstractAlthough unit commitment (UC) based on energy blocks is the most common way to schedule the generators in current power systems, it has been reported that it may not be capable of guaranteeing feasible schedules. In particular, when the instantaneous power trajectories are not modeled explicitly, the solution of the energy-block based UC may include violations of ramp constraints of thermal units, which will typically be managed by an inefficient use of the operating reserves procured. In order to cope with these drawbacks, a new ramp-based UC formulation has been proposed recently in the literature, where it simultaneously schedules ramp and energy. However, this approach has only been tested with academic study cases. In order to assess the applicability of such ramp-based UC, this paper presents a comprehensive comparison between the two scheduling approaches applied to a realistic system. The ERCOT system has been selected as a good representative of a large system, where the generation mix is mainly thermal with a remarkable presence of renewable generation. The numerical results obtained provide strong evidence about the benefits of the ramp-based UC with respect to the energy-block approach.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleRamp-based scheduling vs. energy-block scheduling in day-ahead marketes_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsNetwork-Constrained Unit Commitment (UC), Mixed-Integer Programming, Short-Term Planningen-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-16-030A.pdf453,7 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.