Título : | Adaptation of DOMNA tool to complete the automation of calculation of invoices |
Autor : | Martínez Pérez-Beato, Cristina Vara Vaquero, Juan Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) |
Palabras clave : | 33 Ciencias tecnológicas;3322 Tecnología energética;332205 Fuentes no convencionales de energía;3304 Tecnología de los ordenadores;330413 Dispositivos de transmisión de datos |
Fecha de publicación : | 2016 |
Resumen : | Después de la construcción de las instalaciones de energías renovables en España, se debe
prestar especial atención a su gestión, que se convierte en un asunto prioritario. Las
herramientas utilizadas deben garantizar la fiabilidad de los flujos de información.
El objetivo de esta tesina consiste en integrar en el departamento de medidas y
liquidaciones un proceso fiable que asegure y automatice el cálculo de las liquidaciones
de las centrales mini hidráulicas. Para lograrlo, éstas se han integrado en DOMINA, que
es la herramienta que Iberdrola utiliza para la gestión de sus centrales renovables.
Respecto a la información que generan las plantas (básicamente la lectura de contadoresregistradores
y el estado de las centrales), ésta se almacena en CORE, que es el Centro de
Operación de Renovables en España de Iberdrola. DOMINA toma la información de ahí y
permite validar las mediciones y liquidar a cualquier usuario con acceso a internet. La
herramienta contiene también la información técnica y legal de los generadores.
DOMINA funciona correctamente con parques eólicos y el objetivo es adaptarla para el
uso de las mini hidráulicas. Para ello primero se clasifican las plantas, cada una con una
configuración única (principal, principal de alineación o fórmula), revisando los
esquemas unifilares de las mismas y los datos proporcionados por el Operador del
Sistema.
Después, se introduce en la aplicación la información de los aparatos de medida. El
Operador del Sistema exige la supervisión de estos aparatos cada cierto tiempo, y las
medidas pueden ser consideradas como inválidas si las verificaciones no se llevan a cabo.
DOMINA emite una alerta antes de que ocurra esta situación, y permite generar ingresos
de la manera más rápida posible. El equipamiento de medida igualmente contiene el
código de acceso a CORE para la descarga de medidas (valor bruto de medida).
Para obtener la medida neta, se deben introducir los valores de los coeficientes de
pérdidas. Una vez conseguido este valor, la medida válida (futura liquidable) debe ser
validada. Para ello hay que indicarle a DOMINA cuáles son los números a validar. La
mayoría de las veces es la medida neta, pero a veces se requiere una fórmula de cálculo,
que debe ser desarrollada en la aplicación.
Al final lo que se pretende es automatizar en la medida de lo posible el flujo de
información, desde las plantas generadoras hasta el departamento de liquidación. Con
DOMINA se recoge la información, se valida (asegurándose de que es correcta), y se
liquida la energía, evitando posibles errores.
El principal objetivo, que es solventar en los puntos débiles en la gestión de las mini
hidráulicas, se ha resuelto proponiendo una solución flexible que permita futuros cambios
si fueran necesarios. After the commissioning of the renewable power plants, its management has become a major issue. The tools used to operate them must guarantee the quality and reliability of the data flows. The target of this job is to integrate in the metering and billing department a reliable method that secures and automatizes the calculation of invoices of the mini hydro power plants. To achieve it, these plants have been integrated in DOMINA tool, which is the operational and management tool that Iberdrola uses for the administration of the renewable technologies. Reagarding the information of the plants (basically the lectures of the meters and the actual situation of the power plants), this is gathered in CORE, which is the Renewable Energies Opearion Center of Iberdrola. DOMINA takes that information and allows to any user with internet connection to perform the validation of the measurements and the billing of the power plants. The tool has also the legal and technical information of them. DOMINA works properly with windfarms and the objective has been to adapt it in order to use it for the mini hydro power plants. For that purpose, firstly a classification of the power plants has been done, attending to the configuration. Depending on how the energy is measured and billed, the configuration can be principal, principal of phase and formula. Eah one has its own characteristics. This is checked revewing the single line scheme of the mini hydro and the data that the System Operator disposes. Once the classification of the plants is finished the metering equipment is introduced in the application. The System Operator requires a supervision of this equipment every determined time length, and if the verification is not up to date, the measures could be pointed out as invalid. DOMINA alerts before this situation occurs, and permits to bill the electricity sold as fast as possible. The metering equipment also contains the access code to CORE for storaging the data of the gross energy produced. The coefficients for calculating the net values are determined and introduced in the tool. Once you have the net value, the valid measure must be validated. This value is calculated by DOMINA, but you have to indicate which are those right numbers. Most of the times the net values are the ones that are going to be billed, but others a formula is required. When this sistuation occurs, the application must be programmed in order to know that the valid measure will be the one calculated this way. In the end, what is pretended is to automatize as much as possible the flux of information from the power plants to the billing department. With DOMINA you collect the information, validate it (check that everything is correct), and bill the energy, avoiding possible mistakes. The main objective, which is to solve the weaknesses of the power plants management, is finally solved, and a flexible solution has been put into place, allowing to make quick changes if necessary in a future. |
Descripción : | Master in the Electric Power Industry |
URI : | http://hdl.handle.net/11531/16364 |
Aparece en las colecciones: | H51-Trabajos Fin de Máster |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFM000581.pdf | Trabajo Fin de Máster | 3,19 MB | Adobe PDF | Visualizar/Abrir |
TFM000581 Autorizacion.pdf | Autorización | 536,72 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.