Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/21581
Título : | Regulatory matters affecting distribution planning with distributed generation |
Autor : | Álvarez Pérez, Manuel Alejandro Rönnberg, Sarah K. Bollen, Math H. J. Cossent Arín, Rafael Zhong, Jin |
Resumen : | Under the present European directive concerning common rules for the internal market in electricity, distribution companies are not allowed to own Distributed Generation (DG) but encouraged to include it as a planning option to defer investment in traditional grid reinforcements. Distribution system operators (DSOs) have used the provision of capacity contracted to DG as a viable alternative under current regulatory arrangements. In this paper the topics bonding DSOs and DG owners under the present regulation will be explored and a planning structure that considers Distribution Capacity Contracts (DCCs) as a planning option will be proposed. This will serve as a road map for DSOs to implement its preferred planning tools in an optimization context, considering costs of investment, reliability, operation, and capacity provision while complying with current regulation. |
URI : | http://hdl.handle.net/11531/21581 |
Aparece en las colecciones: | Documentos de Trabajo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-17-103A.pdf | 239,18 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.