dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorBartolomé Artidiello, Rubénes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2018-10-09T09:56:21Z-
dc.date.available2018-10-09T09:56:21Z-
dc.date.issued2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/32394-
dc.descriptionMáster Universitario en Ingeniería Industrial y Máster Universitario en Administración de Empresas (MBA)es_ES
dc.description.abstractEl presente proyecto consiste en el diseño y cálculo del sistema de climatización para un centro deportivo situado en Cáceres, España. Para ello, se hace el análisis de las cargas térmicas en cada estancia a climatizar teniendo en cuenta los factores internos y externos que afectarán a las mismas. Con los resultados de cargas térmicas de invierno y verano en cada sala, y teniendo en cuenta las características constructivas y uso de las mismas se decidirá el sistema de climatización. El centro deportivo dispone de una zona de piscinas en el que el sistema de climatización del aire será diseñado en particular para esta estancia, excluyéndose en el alcance de este proyecto la climatización del agua de los vasos de las piscinas. Una vez determinadas las cargas térmicas y los diferentes sistemas de climatiz.ación, se procede al dimensionamiento y selección de los equipos. Las centrales de producción de agua, que serán calderas en caso de agua caliente y una enfriadora o máquina frigorífica en caso de agua fría, se dimensionan con el resultado del cómputo global de cargas para invierno y verano, respectivamente. Finalmente se calculan las redes de tuberías, que transportarán agua fría o caliente e irán equipadas con bombas centrífugas como máquinas de presión, y las redes de conductos, que transportarán aire y las máquinas de presión serán ventiladores. Se ha justificado la aplicación del RITE en el proyecto, así como otras normativas de aplicación descritas en el mismo. El presupuesto final asciende a 1.198.162,46 €.es-ES
dc.description.abstractThe present project consists of the design and calculation of the air-conditioning system for a sports centre located in Cáceres, Spain. To this end, the thermal loads in each room to be air-conditioned are analysed, taking into account the internal and external factors that will affect them. With the results of thermal loads in winter and summer in each room and taking into account the constructive characteristics and use of them, the air conditioning system will be decided. The sports centre has a swimming pool area in which the air conditioning system will be designed in particular for this room, excluding from the scope of this project the heating of the water in the pool glasses. Once the thermal loads and the different air conditioning systems have been determined, the equipment is sized and selected. The water production plants, which will be boilers in the case of hot water and a chiller or refrigerating machine in the case of cold water, are sized with the result of the global calculation of loads for winter and summer, respectively. Finally, the pipe networks are calculated, which will transport cold or hot water and will be equipped with centrifugal pumps as pressure machines, and the duct networks, which will transport air and the pressure machines will be ventilators. The application of RITE in the project has been justified, as well as other application regulations described in the project. The final budget is €1,198,162.46.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherMII-M (H62-mecanica)es_ES
dc.titleClimatización de un centro deportivo situado en Cácereses_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsClimatización, cargas térmicas, esquemas de principio, red de tuberías, red de conductoses-ES
dc.keywordsAir conditioning, thermal loads, principle diagrams, piping network, duct networken-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster
H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Anexo I RubAn BartolomA Artidiello.pdfAutorización272,24 kBAdobe PDFVisualizar/Abrir
TFM - BARTOLOMA ARTIDIELLO, RUBAN.pdfTrabajo Fin de Máster32,59 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.