Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/3333
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Castejón de Castro, Carlos | |
dc.contributor.author | Troya Cantos, Manuel | |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2015-09-28T09:37:32Z | |
dc.date.available | 2015-09-28T09:37:32Z | |
dc.date.issued | 2008 | |
dc.identifier.uri | http://hdl.handle.net/11531/3333 | |
dc.description | Ingeniero Técnico Industrial | es_ES |
dc.description.abstract | La energía eólica supone una fuente inagotable de producción de energía. Los vientos son generados a causa del calentamiento no uniforme de la superficie terrestre por parte de la radiación solar. Entre el 1 y 2% de la energía proveniente del sol se convierte en viento. Incluso teniendo en cuenta que sólo el 1 O % de esta energía se encuentra disponible cerca del suelo, el potencial sigue siendo considerable, suponiendo una cantidad de energía que podría abastecer a gran parte de la población. Las nuevas tecnologías , que proporcionan un rendimiento cada vez más eficiente, y el continuo desarrollo del sector están provocando un gran crecimiento a nivel mundial, siendo España el segundo productor de energía eólica después de Alemania. El alto potencial eólico dentro de la península Ibérica, un marco legal favorable y una tecnología propia muy desarrollada garantizan una rentabilidad elevada en este tipo de energía durante los próximos años. Este proyecto detalla la viabilidad de un parque eólico de 32 MW situado en la provincia de Albacete (Castilla-La Mancha). Para ello es necesario un estudio previo del recurso eólico de la zona. Con este estudio como base, el aerogenerador que más se ajusta a las características de la zona es el modelo Gamesa G90 de 2MW de potencia, por su alto rendimiento y su buen funcionamiento a velocidades medias de viento, de aproximadamente 9,5 metros por segundo. Por cuestiones de fiabilidad y por su trayectoria en el sector eólico, la maquinaria suministrada e instalada será en su totalidad de la multinacional Gamesa, corporación tecnológica dedicada al diseño, fabricación y suministro de productos, instalaciones y servicios avanzados en el sector de las tecnologías para la sostenibilidad energética, especialmente la eólica. La superficie total del parque, 208 hectáreas, determinará el número total de aerogeneradores a instalar. Se procederá a colocar tantos molinos como sea posible, para aumentar la rentabilidad del parque, mediante el explotamiento de todas las zonas permisibles del mismo según normativa. En este caso, el número máximo será de dieciséis aerogeneradores. La línea de evacuación será una línea subterránea de 20kV de 8 km. de longitud que transportará la energía producida por el parque hasta el punto de evacuación de la red de distribución. Con el número de aerogeneradores ya determinado, con un estudio del potencial eólico de la zona y con las características técnicas de producción del aerogenerador, es posible hacer una aproximación a la producción media anual del parque. Ésta será de unos 133.000 MW-h/año, lo que hace del mismo un parque muy rentable económicamente. Antes de analizar en concepto de rentabilidad toda la instalación, será necesario hacer una evaluación del presupuesto total del mismo. El presupuesto general constará básicamente de tres partes bien diferenciadas; obra civil, obra eléctrica y aerogeneradores. Con todo ello, el coste total de suministro e instalación será de 22.186.000 €,de los cuales un 20% será de propia inversión y un 80% de inversión aJena. Con esta cifra es posible hacer un estudio económico y de rentabilidad considerando una vida útil del parque de 20 años. Según la tarificación de 2007 el precio del MWh asciende a 73 €. Las primas y tarifas se indexan con IPC -0,25 hasta el 31 de diciembre de 2012 y con IPC -0,5 a partir de entonces. Éstos serán los ingresos brutos a lo que habrá que descontar gastos por alquiler del terreno, mantenimiento del parque y pago del préstamo a 1 O años. El beneficio neto a los 20 años será de 206.839.000 € antes del pago de impuestos. La tasa de retomo sobre la inversión inicial será, por tanto , muy elevada, próxima al 21 %, lo cual corrobora la rentabilidad de estas instalaciones. Tanto la selección del emplazamiento, como la futura construcción e instalación de todos los equipamientos necesarios en el parque eólico se realizarán de forma que se minimicen los impactos medio ambientales pudiendo ser asimilados por el entorno a corto plazo. En definitiva, se trata de un parque con una rentabilidad garantizada dado las condiciones eólicas que afectan al emplazamiento a lo largo de todo el año . Por lo tanto, por todo lo expuesto anteriormente, se entiende que el proyecto es viable tanto técnica como económicamente y sostenible medioambientalmente | es_ES |
dc.description.abstract | Wind power is an inexhaustible source of energy. The wind is generated by the irregular warming of the terrestrial surface by the solar radiation. Approximately 1 and 2% of the energy from the Sun turns into wind. Even bearing in mind that only 10% of this energy is available near the ground, the potential is still reasonable, since it results in a quantity of energy enough for great part of the population. The new technologies, which provide an increasingly efficient operating performance and the continuous development of the sector are causing an important growth worldwide, being Spain the second wind power producer after Germany. The high wind potential in Spain, a favourable legal frame and Spain's own developed technology warrant high profitability of this type of energy for the next years. This project analyses the viability of a 32 MW wind farm placed in Albacete (Castilla-La Mancha). Por this purpose, it is necessary to study previously the wind resource of the area. Based on the results of this study, the mill which more adjusts to the characteristics of the area is Gamesa G90 with 2MW of power, given its high operating performance and the fact that it works correctly with medium-speed winds of approximately 9.5 metres per second. Due to viability aspects and its path in the wind sector within the last few years, all the supplied and installed machinery will belong to the multinational Gamesa, a technological corporation dedicated to the design, manufacture and supply of products, facilities and advanced services in the sector of the technologies for the energetic sustainability, specially the wind one. The surface of the wind farm (208 hectares) will determine the total number of mills to be installed. In order to increase the profitability of the park, there will be placed as many mills as possible, up to a maximum of sixteen mills. The line of evacuation will be an underground line of 20kV and 8 km long that will transport the energy generated by the farm to the point of evacuation of the distribution network. Once the quantity of mills is airead y certain, a study of the wind potential of the area is done and the production technical characteristics of the mill are calculated, it is possible to make an approximate average of the annual production of the park. This one will be of approximately 133,000 MW-hour per year, which means that economically, it will be a very profitable park. Before analyzing the whole installation, in terms of profitability it will be necessary to make an evaluation of the total budget. The total budget will consist basically of three different parts: civil work, electrical work and the mills. Therefore, the total cost of supply and installation will be of 22, 186,000 €; 20% of which will be of own investment and 80% of foreign investment. With this figure it is possible to make an economic profitability study considering 20 years of useful life of the park. Regarding the rates of the year 2007, the cost was of 73 €/MW-h. The premiums and tariffs until 31December2012 are indexed by-0.25 CPI, and by -0.5 CPI from then on. This will be the gross income. It will be necessary to discount expenses for the renting of the area, maintenance of the farm and payment of the ten-year-loan. In twenty years, the net profit will be of 219,000,000 € before payment of taxes. The rate of retum on the initial investment will be, therefore, very high, near 21 %, which corroborates the profitability of these installations .Both the selection of the emplacement and the future construction and installation of all the necessary equipments in the wind farm will be carried out so that the impacts are minimized and can be assimilated by the environment on a short-term basis. Finally, due to the wind conditions of the area throughout the whole year, it is definitely a profitable farm. That is the reason why, for all the above purposes, it is understood that this project is feasible economically as well as in terms of sustainability. | es_ES |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es | es_ES |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3322 Tecnología energética | es_ES |
dc.subject | 332202 Generación de energía | es_ES |
dc.title | Pargue Eólico | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/closedAccess | es_ES |
Aparece en las colecciones: | ICAI - Proyectos Fin de Carrera |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
PFC000272.pdf | Proyecto Fin de Carrera | 48,91 MB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.