Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/34553
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorPalacios López, Mikeles-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2019-01-18T10:36:47Z-
dc.date.available2019-01-18T10:36:47Z-
dc.date.issued2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/34553es_ES
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEl Proyecto Climatización de un edificio de oficinas en Castellón tiene como finalidad que el alumno aprenda todo el proceso que se debe seguir en un proyecto de climatización. El proyecto consta de cuatro documentos principales y dos menores. El primer documento es la Memoria, en el que se presenta el problema y se va resumiendo parte por parte cada una de las fases del proyecto de manera resumida y más teórica. El segundo documento, Cálculos es el grueso del proyecto, ya que en él se explica detalladamente todo lo que se ha realizado y el porqué de las cosas. Además, se justifica siempre la procedencia y conclusiones obtenidas. El documento Planos aglutina todos los planos del edificio, tanto de conductos como de tuberías y el esquema de principio. Por último, como documento principal queda el presupuesto en el que se detalla cada uno de los elementos escogidos y las unidades de cada uno de ellos para dar un coste final de la instalación. Además de estos cuatro documentos, hay otros dos documentos que se pueden considerar de menor importancia como son los Anejos, donde se encuentran todas las tablas de cálculos y los catálogos y el Pliego de Condiciones que recoge la normativa de los equipos.es-ES
dc.description.abstractThe project called Air Conditioning of an office building in Castellon has a main goal which is that the pupil learns all the process behind an air conditioning project and the different phases in it. The project has four main documents and two minor ones. The first document is the Memory, in which the problem is presented to the reader and it is somehow solved bit by bit in a theoretical way and also summed up. The second document, the Calculation is the core part of the project because it gives a detailed explanation of all the different part of the project while justifying every part of t. Additionally, it answers why and how things are done while providing conclusions. The next document the Plans of the building are shown. Those plans are the pipes and conducts one mainly. Finally, as the last main document we have the Budget remaining. In the budget, every equipment chosen for the project is detailed both in price, description and units needed to end up with a total installation cost for the project. Besides those four main core documents there is also the Annex which includes the tables and catalogues and the bid specifications, where the different legal aspects are explained.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherMII-M (H62-mecanica)es_ES
dc.titleClimatización de un edificio de oficinas en Castellónes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsFancoils, tubería, conducto, agua, cargases-ES
dc.keywordsFancoils, pipe, conduct, water, loadsen-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM - Palacios Lopez, Mikel.pdfTrabajo Fin de Máster17,24 MBAdobe PDFVista previa
Visualizar/Abrir
Anexo I Mikel Palacios.pdfAutorización77,86 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.