Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/36641
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorIbáñez Aranguren, Albertoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2019-05-09T22:03:32Z-
dc.date.available2019-05-09T22:03:32Z-
dc.date.issued2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/36641-
dc.descriptionGrado en Ingeniería Electromecánicaes_ES
dc.description.abstractEl proyecto estudia la instalación de climatización de un edificio de oficinas en Madrid aplicando la normativa vigente. El edificio se compone de cuatro plantas con similar distribución y cubierta plana transitable donde alojar equipos. La superficie total a climatizar es de 8.084 m2. Inicialmente, se calculan cargas térmicas de verano e invierno en las condiciones interiores de confort y climáticas exteriores. Para verano, se han tenido en consideración las cargas por ocupación, alumbrado, equipos, de radiación solar y transmisión de la envolvente térmica para la hora y mes más desfavorables. Obteniéndose una potencia frigorífica total de 975 KW y calorífica de 655 KW. Posteriormente, se han obtenido los caudales de ventilación en función de la calidad de aire y la ocupación. Se ha considerado una calidad de aire interior IDA 2 cuyo caudal exterior equivalente es 12,5 dm3/s. persona. Con las cargas obtenidas y el caudal de ventilación se definieron los equipos proyectados: fan-coils, climatizadores, enfriadoras y calderas. Para la impulsión, extracción y retorno del aire se contará con difusores lineales y rotacionales y rejillas dimensionados al efecto. El retorno se ha resuelto mediante plénum en falso techo y para la extracción se ha proyectado una red de conductos hasta el climatizador de aire primario. Después, se ha realizado el cálculo y dimensionamiento de la red de conductos rectangulares y tuberías. Para la red de tuberías se distinguen los circuitos primarios encargados de conducir el agua del colector principal a las enfriadoras y calderas y los circuitos secundarios que transportarán el agua a los fan-coils y climatizadores. Estos circuitos cuentan con: impulsión de agua fría y agua caliente y retorno de agua fría y caliente. Otros equipos auxiliares empleados son: extractores, vasos de expansión, compuertas cortafuego y de regulación,…. El presupuesto del proyecto es 1.156.864,48 €.es-ES
dc.description.abstractThe project consists in the air conditioning system of an office building in Madrid applying the current legal regulations. The building has four floors with similar distribution and a flat roof where the air conditioning equipment can be hold. The total built area is 8.084 m2. Firstly, I started to calculate the thermal loads of summer and winter in the inside conditions of comfort and climatic external. In summer, the loads of occupancy, lighting, equipment, solar radiation and walls and ceilings transmission have been taken into consideration for the unfavorable situation. Obtaining a total cooling power of 975 KW and calorific power of 655 KW. Later, the ventilation volumes of each room have been obtained according to the air quality and its occupation. It has been considered an interior air quality IDA 2 whose equivalent external flow is 12.5 dm3/s per person. With the thermal loads and the ventilation flow, the equipment used in the installation were defined: fan-coils, air handling units, water chillers and boilers. For the impulsion, extraction and return airs it has been projected linear and rotational diffusers and grilles dimensioned for the purpose. The return has been solved through plenum in false ceiling and for the extraction air a duct network has been designed up to the primary air conditioner. Then, the calculation and sizing of the network of rectangular ducts and pipes was carried out. For the pipe network, the primary circuits are used to drive the water from the main collector to the water chillers and boilers, and the secondary circuits which transport the water to the fan-coils and air handling units. These circuits drive supplied and returned cold and hot water. Others auxiliary equipment used are extractors, expansion vessels, fire and regulation gates… The budget of the project is 1.156.864,48 €.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherIEM-M (KL0-mecanica)es_ES
dc.titleClimatización de un edificio de oficinas en Madrides_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsCLIMATIZACIÓN, OFICINAS, CARGAS TÉRMICAS, FAN-COILS, ENFRIADORAS, CLIMATIZADORES, CALDERASes-ES
dc.keywordsAIR CONDITIONING, OFFICE, THERMAL LOADS, FAN-COILS, AIR HANDLING UNITS, WATER CHILLERS, BOILERSen-GB
Aparece en las colecciones: KL0-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG- IBAAEZ ARANGUREN, ALBERTO.pdfTrabajo Fin de Grado17,09 MBAdobe PDFVista previa
Visualizar/Abrir
ANEXO I.pdfAutorización194,27 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.