Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/41897
Título : Instalación Fotovoltaica para Ahorro Energético y Sostenibilidad en Centro Logístico de IBERIA L.A.E.
Autor : Barreiro Nogaledo, Enrique
Vaquero Martínez, Álvaro
Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)
Fecha de publicación : 2020
Resumen : En este proyecto se ha desarrollado una instalación fotovoltaica de 2,324 MW con conexión a red para autoconsumo en el centro logístico de mantenimiento de IBERIA L.A.E. en La Muñoza. El objetivo de este proyecto ha sido en todo momento buscar la máxima eficiencia energética con el uso de la energía solar fotovoltaica en un entorno industrial mediante una inversión económicamente viable y que potencie el ahorro del cliente a lo largo de los 20 años de vida útil de la instalación. La instalación ha sido ubicada en la cubierta del edificio, situado en las proximidades del aeropuerto Madrid-Barajas Adolfo Suárez, que se divide en dos zonas. La primera zona, ubicada en el noroeste y dividida en 8 cubiertas, cuenta con un área de 5150 m2. La segunda zona, ubicada en el sureste y dividida también en 8 cubiertas, cuenta con un área de 4900 m2. La generación anual neta de la instalación el primer año, se ha calculado en 3.123.981 kWh. Teniendo en cuenta la bajada de rendimiento de los módulos cada año se ha estimado la generación neta de la instalación a lo largo de sus 20 años de vida útil en un total de 57.985.799 kWh. El proyecto llevado a cabo se alinea con los objetivos de sostenibilidad del Plan Estratégico del Grupo IAG (matriz de IBERIA), fomentando el uso de energía renovable y por lo tanto disminuyendo su huella de carbono, garantizando de este modo una autoproducción de energía sostenible y alineándose con los objetivos 7,9,12 y 13 de los objetivos para el desarrollo sostenible (ODS).
In this project, a 2,324 MW photovoltaic installation with grid connection for self-consumption has been developed in the IBERIA L.A.E. logistics maintenance center in La Muñoza. The objective of this project has been at all times to seek the maximum energy efficiency with the use of photovoltaic solar energy in an industrial environment through an economically viable investment that enhances costumer savings over the 20 useful life year of the installation. The installation has been located on the roof of the building, located near the Madrid-Barajas Adolfo Suárez airport, which is divided into two areas. The first area, located northwest and divided into 8 decks, has an area of 5,150 m2. The second zone, located southeast and also divided into 8 decks, has an area of 4,900 m2. The net annual generation of the installation during the first year has been calculated at 3,123,981 kWh. Considering the drop in performance of the modules each year, the net generation of the installation over its 20 years of useful life has been estimated at a total of 57,985,799 kWh. The project carried out is aligned with the sustainability objectives of the Strategic Plan of the IAG Group (IBERIA's parent company), promoting the use of renewable energy and therefore reducing its carbon footprint, thus guaranteeing sustainable energy self-production and aligning itself with goals 7, 9, 12 and 13 of the Sustainable Development Goals (SDGs).
Descripción : Grado en Ingeniería en Tecnologías Industriales
URI : http://hdl.handle.net/11531/41897
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG- Vaquero Martinez, Alvaro.pdfTrabajo Fin de Grado9,16 MBAdobe PDFVista previa