Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/51304
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Cepeda Fernández, Fernando | es-ES |
dc.contributor.author | Merino Limés, Fernando | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2020-09-30T09:43:43Z | |
dc.date.available | 2020-09-30T09:43:43Z | |
dc.date.issued | 2021 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/51304 | |
dc.description | Máster Universitario en Ingeniería Industrial | es_ES |
dc.description.abstract | El presente proyecto busca asegurar el confort térmico de las personas presentes en un edificio de oficinas situado en Barcelona, mediante la instalación de un sistema de climatización atendiendo a las normas vigentes. La superficie total del mismo a tener en cuenta para la climatización es de 6.000 m2. El edificio está compuesto por tres plantas (baja, primera y segunda) y una cubierta. El espacio de oficinas está comprendido entre las plantas baja y segunda y por tanto será el espacio objeto de la climatización, quedando así la cubierta, para albergar los equipos de mayor tamaño del sistema de climatización. Para un correcto y eficiente diseño del sistema de climatización del proyecto en cuestión, se ha seguido el siguiente procedimiento. Una vez distribuidas las estancias de cada planta, se han calculado las cargas térmicas a vencer tanto en invierno como en verano. Para el caso de verano se ha tenido en cuenta cargas térmicas externas como la radiación solar, transmisión por cerramientos y cargas internas como son el nivel de iluminación, equipamiento electrónico o nivel de ocupación. Todas ellas se han considerado para el día y mes más desfavorable para cada una de las estancias. Sin embargo, para el cálculo de las cargas en invierno no se han tenido en cuenta factores como la ocupación o equipamiento ya que estos favorecen las condiciones térmicas deseadas. Teniendo en cuenta los factores mencionados anteriormente se obtienen unas cargas de verano e invierno de 1009 kW y 611 kW respectivamente. El siguiente paso ha sido obtener los caudales de aire necesarios, tanto de impulsión como de retorno, en cada una de las estancias a climatizar. Una vez obtenidos los caudales de aire y teniendo en cuenta las cargas térmicas a vencer, se distribuye de manera uniforme los fancoils encargados de la climatización de las oficinas. A su vez, se han dimensionado los conductos de aire, las rejillas de extracción a situar en los mismos y los difusores. Paralelamente, se obtienen los caudales tanto de agua fría como de agua caliente necesarios en cada estancia, en función de las cargas térmicas de verano e invierno. Destacar también que cada circuito de agua caliente y fría tiene a su vez el circuito de retorno correspondiente. Para el dimensionamiento de la red de tuberías se ha tenido en cuenta que la pérdida de carga no sea mayor a 30 mm.c.a./m ni que la velocidad sea superior a 2 m/s, para un correcto funcionamiento de la instalación. Finalmente, el coste del presente proyecto, teniendo en cuenta los equipos y elementos empleados, lo hemos establecido en 1.276.323,43 €. | es-ES |
dc.description.abstract | This project seeks to ensure the thermal comfort of the people in an office building located in Barcelona by installing an air-conditioning system in accordance with current standards. The total surface area to be taken into account for air conditioning is 6,000 m2. The building consists of three floors (ground, first and second) and a roof. The office space is between the ground and second floors and will therefore be the space to be air-conditioned, leaving the roof to the larger equipment of the air-conditioning system. For a correct and efficient design of the air-conditioning system of the project in question, the following procedure has been followed. Once the rooms on each floor had been distributed, the thermal loads to be overcome in both winter and summer were calculated. In the case of summer, external thermal loads such as solar radiation, transmission through enclosures and internal loads such as the level of lighting, electronic equipment or occupancy level have been taken into account. All of them have been considered for the most unfavourable day and month for each of the rooms. However, for the calculation of winter loads, factors such as occupancy or equipment have not been taken into account, as these favour the desired thermal conditions. Considering the above-mentioned factors, the summer and winter loads of 1009 kW and 611 kW respectively were obtained. The next step was to obtain the necessary air flow rates, both supply and return, in each of the rooms to be air-conditioned. Once the air flow rates had been obtained and taking into account the thermal loads to be overcome, the fan coils responsible for the air conditioning of the offices were distributed uniformly. At the same time, the air ducts, the extraction grilles to be placed in them and the diffusers have been dimensioned. At the same time, the flow rates of both cold water and hot water required in each room were obtained, depending on the summer and winter thermal loads. It should also be noted that each hot and cold water circuit has its own return circuit. For the sizing of the pipe network, it has been taken into account that the head loss should not be greater than 30 mm.w.c./m and that the velocity should not be greater than 2 m/s, in order for the installation to function correctly. Finally, the cost of this project, considering the equipment and elements used, has been established at 1.276.323,43 €. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es-ES | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3310 Tecnología industrial | es_ES |
dc.subject | 331001 Equipo industrial | es_ES |
dc.subject.other | H62-mecanica (MII-M) | es_ES |
dc.title | Climatización de un edificio de oficinas en Barcelona | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/closedAccess | es_ES |
dc.keywords | Climatización, Refrigeración, Oficinas, Barcelona | es-ES |
dc.keywords | Air conditioning, Cooling, Offices, Barcelona | en-GB |
Aparece en las colecciones: | H62-Trabajos Fin de Máster |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFM-MerinoLimes,Fernando-.pdf | Trabajo Fin de Máster | 14,34 MB | Adobe PDF | Visualizar/Abrir |
Anexo I.pdf | Autorización | 71,02 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.