Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/51628
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMartín Serrano, Javieres-ES
dc.contributor.authorMenéndez Ramos, Carloses-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2020-10-08T09:21:07Z
dc.date.available2020-10-08T09:21:07Z
dc.date.issued2021es_ES
dc.identifier.urihttp://hdl.handle.net/11531/51628
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEn el proyecto se llevará a cabo la climatización de un centro deportivo/acuático en Jaén. Para realizar el proyecto se ha llevado a cabo un estudio en detalle de la normativa, con especial foco en los requisitos característicos de las piscinas. Concluido el estudio de la normativa se climatizará el agua del vaso de la piscina, para ello se estudiará las pérdidas primero y después se seleccionará el equipo correspondiente. Climatizada el agua del vaso se pasará a hacer lo propio con el ambiente de las diferentes zonas del edificio, una vez más la zona de la piscina será la más delicada ya que tiene las condiciones de confort más estrictas. Para climatizar dichas zonas habrá que calcular las cargas térmicas primero, después habrá que seleccionar los equipos que se van a utilizar para satisfacer las cargas. Elegidos los equipos se dimensionarán las tuberías en el caso de la red de agua y los conductos para la red de aire. El diseño de los circuitos estará limitado por las pérdidas máximas que se pueden producir a lo largo de ellos y por las características constructivas del edificio. Concluido el diseño de los circuitos se pasa a realizar los planos de las instalaciones en los que se representarán tanto los esquemas de principio como los diferentes circuitos en el propio edificio. Finalmente se hará el presupuesto del coste de realizar la climatización del edificio.es-ES
dc.description.abstractThe project will be implemented for the air conditioning system of a sports/aquatic center in Jaén. In order to carry out the project, a detailed study of the regulations has been carried out, with special focus on the characteristic requirements of swimming pools. Once the study of the regulations has been completed, the water in the pool will be heated, first the losses will be studied and then the corresponding equipment will be selected. Once the water in the pool has been conditioned, the same will be done with the environment in the different areas of the building. Once again, the pool area will be the most delicate since it has the strictest comfort conditions. In order to air-condition these areas, the thermal loads must first be calculated, then the equipment to be used to satisfy the loads must be selected. Once the equipment has been chosen, the pipes will be sized in the case of the water network and the ducts for the air network. The design of the circuits will be limited by the maximum losses that can occur along them and by the constructive characteristics of the building. Once the design of the circuits has been completed, the next step is to draw up the drawings of the installations in which both the principle diagrams and the different circuits in the building itself will be represented. Finally, the cost estimate for the air conditioning of the building will be made.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicaes_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject3305 Tecnología de la construcciónes_ES
dc.subject.otherH62-mecanica (MII-M)es_ES
dc.titleClimatización de un centro acuático/deportivo en Jaenes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsNormativa, Cargas térmicas, Equipos, Conductos, Tuberías, Planos, Presupuestoes-ES
dc.keywordsRegulations, Thermal loads, Equipment, Ductwork, pipes, Drawings, Budgeten-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM-Menendez,Ramos,Carlos.pdfTrabajo Fin de Máster14,35 MBAdobe PDFVista previa
Visualizar/Abrir
Carlos Menendez Ramos.pdfAutorización64,38 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.