Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/55730
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSendín Escalona, Albertoes-ES
dc.contributor.advisorMatanza Domingo, Javieres-ES
dc.contributor.authorVillasante Martín, Borjaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2021-05-20T10:38:46Z
dc.date.available2021-05-20T10:38:46Z
dc.date.issued2021es_ES
dc.identifier.urihttp://hdl.handle.net/11531/55730
dc.descriptionMáster Universitario en Ingeniería Industrial + Máster in Smart Gridses_ES
dc.description.abstractEste proyecto se enfrenta a la estructuración del primer despliegue masivo de contadores con la tecnología PRIME 1.4 realizado por Iberdrola, siendo este también pionero a nivel mundial. Tres municipios españoles han sido seleccionados para el despliegue, dadas sus características adecuadas para este primer piloto. Se ha realizado un estudio de la topología eléctrica de los centros de transformación, analizando también las correlaciones existentes entre las variables eléctricas seleccionadas para el mismo y proponiendo una primera clasificación de centros basada únicamente en tres de estas variables, obteniendo grupos de centros con topología eléctrica similar y por tanto cuyo funcionamiento PLC debería ser a priori parecido. Ante la imposibilidad de lograr una buena clasificación de centros empleando únicamente la topología eléctrica, se ha continuado con una monitorización completa del funcionamiento PLC de los centros, obteniendo información muy detallada de su comportamiento con PRIME 1.3.6, la tecnología PLC instalada actualmente en campo y que será próximamente sustituida por PRIME 1.4. Posteriormente, se ha utilizado la información de las monitorizaciones para categorizar los centros empleando técnicas de Machine Learning, consiguiendo grupos de centros con características similares y resultando esta vez sí ser apropiados para organizar el despliegue. Finalmente, se ha estructurado el despliegue en fases con dificultad incremental progresiva, empleando las categorías de centros previamente diseñadas para seleccionar los centros más adecuados para cada fase, asegurando así una transición fluida a PRIME 1.4 y maximizando el aprendizaje.es-ES
dc.description.abstractThis project faces the task of structuring the first massive PRIME 1.4 deployment of Iberdrola, being it also the first of its kind worldwide. Three Spanish municipalities have been selected for the deployment due to their appropriate characteristics for this first pilot. A study of the electric topology of the secondary substations (SSs) has been performed, including a correlation analysis between the electric variables that were selected for the study and proposing a first SSs draft classification using only three of those variables, obtaining SSs groups with similar topology and thus also probably similar PLC behavior. However, due to the impossibility of achieving a good enough classification using only electric variables, a complete PLC performance monitoring of the SSs has been performed, obtaining detailed information of the PRIME 1.3.6 performance of the SSs, the PLC technology currently deployed on the field. Afterwards, the information extracted from the monitoring has been used to categorize the SSs using Machine Learning techniques, this time achieving SSs groups with homogeneous PLC performance and that are adequate to arrange the deployment. Finally, the deployment has been structured in stages with incremental complexity, using the previously designed categories to select the most appropriate SSs for each stage, guaranteeing a smooth transition to PRIME 1.4 and maximizing the knowledge gained in the process.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3306 Ingeniería y tecnología eléctricaes_ES
dc.subject330609 Transmisión y distribuciónes_ES
dc.subject.otherH62-electronica (MII-N)es_ES
dc.titleAnalysis and preparation of the deployment of PRIME 1.4 smart meters in an interoperable field environment for 15,000 meterses_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsCentro de transformación, Contadores inteligentes, Estrategia de despliegue, NB-PLC, PRIME v1.4, Smart grides-ES
dc.keywordsDeployment strategy, NB-PLC, PRIME v1.4, Secondary substation, Smart grid, Smart metersen-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM-Villasante Martin, Borja.pdfTrabajo Fin de Máster7,85 MBAdobe PDFVista previa
Visualizar/Abrir
AnexoI_BorjaVillasanteMartin.pdfAutorización242,79 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.