Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/56164
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorCenteno Hernáez, Efraimes-ES
dc.date.accessioned2021-06-07T12:05:05Z-
dc.date.available2021-06-07T12:05:05Z-
dc.identifier.urihttp://hdl.handle.net/11531/56164-
dc.description.abstractes-ES
dc.description.abstractThis paper presents in a systematic way the basic ideas about cost recovery of marginalist theory. Differences between short? and long?term costs are analysed and its consequences on investment cost recovery on a basic annualized generation expansion capacity model. It is a first step in order to extend these results to more complex models including several years.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleRevisiting cost recovery of generation capacity investments with annualized cost representationes_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsGeneration Expansion Planning, Marginalist Theory, Cost Recoveryen-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-20-080A.pdf204,12 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.