Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/62847
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorChazarra Jover, Manueles-ES
dc.contributor.authorPérez-Díaz, Juan I.es-ES
dc.contributor.authorGarcía González, Javieres-ES
dc.date.accessioned2021-10-27T03:05:47Z-
dc.date.available2021-10-27T03:05:47Z-
dc.identifier.urihttp://hdl.handle.net/11531/62847-
dc.description.abstractes-ES
dc.description.abstractThis paper analyses the economic viability of pumped-storage hydropower plants equipped with ternary units and considering hydraulic short-circuit operation. The analysed plant is assumed to participate in the day-ahead energy market and in the secondary regulation service of the Spanish power system. A deterministic day-ahead energy and reserve scheduling model is used to estimate the maximum theoretical income of the plant assuming perfect information of the next day prices and the residual demand curves of the secondary regulation reserve market. Results show that the pay-back periods with and without the hydraulic short-circuit operation are significantly lower than their expected lifetime and that the pay-back periods can be reduced with the inclusion of the hydraulic short-circuit operation.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.titleEconomic viability of pumped-storage power plants equipped with ternary units and considering hydraulic short-circuit operationes_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordses-ES
dc.keywordsen-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-17-053A.pdf942,11 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.