Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/64320
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorCenteno Hernáez, Efraimes-ES
dc.contributor.authorCampos Fernández, Francisco Albertoes-ES
dc.contributor.authorMaguregui, Javieres-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.date.accessioned2021-12-10T04:11:10Z-
dc.date.available2021-12-10T04:11:10Z-
dc.identifier.urihttp://hdl.handle.net/11531/64320-
dc.description.abstractes-ES
dc.description.abstractThis papers presents some advances in answering the question of cost recovery of investments for the optimal technological mix in electricity systems.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleMinimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?es_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsElectricity Generation Capacity Planning, Electricity Market, Cost-Recovery, Marginalist Theoryen-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-21-213WP.pdf709,66 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.