Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/64320
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Centeno Hernáez, Efraim | es-ES |
dc.contributor.author | Campos Fernández, Francisco Alberto | es-ES |
dc.contributor.author | Maguregui, Javier | es-ES |
dc.contributor.author | Wogrin, Sonja | es-ES |
dc.date.accessioned | 2021-12-10T04:11:10Z | - |
dc.date.available | 2021-12-10T04:11:10Z | - |
dc.identifier.uri | http://hdl.handle.net/11531/64320 | - |
dc.description.abstract | es-ES | |
dc.description.abstract | This papers presents some advances in answering the question of cost recovery of investments for the optimal technological mix in electricity systems. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.title | Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing? | es_ES |
dc.type | info:eu-repo/semantics/workingPaper | es_ES |
dc.description.version | info:eu-repo/semantics/draft | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Electricity Generation Capacity Planning, Electricity Market, Cost-Recovery, Marginalist Theory | en-GB |
Aparece en las colecciones: | Documentos de Trabajo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-21-213WP.pdf | 709,66 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.