Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/64614
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGuardiola Arnanz, Jesúses-ES
dc.contributor.advisorAwad Parada, Tamares-ES
dc.contributor.advisorFraiz Cosano, Davides-ES
dc.contributor.authorCobo Pérez-Minayo, Migueles-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-01-04T14:43:46Z
dc.date.available2022-01-04T14:43:46Z
dc.date.issued2022es_ES
dc.identifier.urihttp://hdl.handle.net/11531/64614
dc.descriptionGrado en Ingeniería en Tecnologías Industriales y Grado en Administración y Dirección de Empresases_ES
dc.description.abstractMediante procesos de industrialización de la construcción se propone un modelo alternativo a la construcción convencional que sienta sus bases en la metodología lean. Este modelo de construcción se compone de módulos y componentes fabricados y transportados hasta la edificación para ser acoplados a estos módulos. Los componentes ofrecen múltiples ventajas como la fácil reparación y mantenimiento de estos al tener sus redes de instalaciones concentradas y totalmente accesibles. De este modo se puede realizar una revisión o reparar una avería sin tener que entrar el operario al interior del edificio, evitando obras húmedas. Así mismo estos componentes se pueden sustituir de manera sencilla por otros según las necesidades del usuario sin necesidad de hacer una reforma y sus posibilidades de personalización son muy diversas, al poder configurarlos de la manera que se deseé. Además, este grado de industrialización con los componentes producidos en fábricas con el mejor equipamiento y profesionales cualificados ofrecen una garantía de calidad supervisada por controles que no obtenemos en una construcción convencional. Serán objeto de estudio en este proyecto los plazos de esta propuesta, buscando la optimización de estos mediante la simultaneidad de procesos para reducirlos al mínimo. Para ello se hará uso de representaciones de los procesos de construcción de los módulos en Solid Edge, así como de diagramas de Gantt para representar los plazos de todas las operaciones.es-ES
dc.description.abstractThrough construction industrialization processes, an alternative model to conventional construction is proposed, based on lean methodology. This construction model is composed of modules and components manufactured and transported to the building to be coupled to these modules. The components offer multiple advantages such as easy repair and maintenance of these components by having their installation networks concentrated and fully accessible. In this way it is possible to carry out a revision or repair a breakdown without the worker having to enter the interior of the building, avoiding wet works. Likewise, these components can be easily replaced by others according to the user's needs without the need for refurbishment and their customization possibilities are very diverse, as they can be configured in any way desired. In addition, this degree of industrialization with the components produced in factories with the best equipment and qualified professionals offers a quality guarantee supervised by controls that we do not obtain in a conventional construction. This project will study the deadlines of this proposal, seeking the optimization of these through the simultaneity of processes to reduce them to a minimum. For this purpose, we will make use of Solid Edge representations of the construction processes of the modules, as well as Gantt diagrams to represent the deadlines of all operations.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoeses_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3305 Tecnología de la construcciónes_ES
dc.subject330524 Construcciones prefabricadases_ES
dc.subject.otherKTI-organizacion (GITI-O)es_ES
dc.titleSistemas de montaje para una construcción de "Componentes Compatibles" : 3C siguiendo la metodología Leanes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsOptimización, Lean, Módulo, Simultaneidad de procesoses-ES
dc.keywordsOptimization, Lean, Module, Process Simultaneityen-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG-CoboPerezMinayoMiguel.pdfTrabajo Fin de Grado2,19 MBAdobe PDFVista previa
Visualizar/Abrir
AnexoI.pdfAutorización29,86 kBAdobe PDFVista previa
Visualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.