Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/6542
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | CLEDERA-CASTRO, María del Mar | - |
dc.contributor.advisor | Morales-Polo, Carlos | - |
dc.contributor.author | Barrena Arzamendi, Aitor | - |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2016-02-25T13:03:22Z | - |
dc.date.available | 2016-02-25T13:03:22Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | http://hdl.handle.net/11531/6542 | - |
dc.description | Grado en Ingeniería Electromecánica | es_ES |
dc.description.abstract | En los últimos tiempos debido a la industrialización y al creciente desarrollo de la actividad humana ha provocado un aumento en la contaminación de las aguas. Al comienzo de esta etapa las aguas eran capaces de estabilizarse naturalmente ya que el grado de contaminación no era muy grande, sin embargo, a medida que pasan los años los vertidos y contaminantes son más complejos y en mayores cantidades y es por ello porque en la actualidad es imprescindible un saneamiento y tratamiento de nuestras aguas. En este proyecto se estudiará el control de un tratamiento biológico de fangos activos. En toda depuradora hay dos tipos de líneas, la de aguas y la de fangos. En la línea de aguas se producen diferentes tratamientos, en primer lugar un pre-tratamiento dónde se eliminan los sólidos mayores, después el tratamiento primario que consiste en un proceso de clarificación, sedimentación y decantación. Por último se encuentra el tratamiento secundario, en el que se centra este proyecto, dónde se intenta disminuir hasta los valores establecidos por la Unión Europea la demanda bioquímica de oxígeno (DBO<125 mg/L). | es_ES |
dc.description.abstract | Nowadays, due to the industrialization and the development of human activity, water pollution has increased. At the beginning, water was capable to de stabilized naturally as the degree of contamination was not high, however, as time passes, discharges and pollutants become more complex and in higher quantities. That is why nowadays water treatment is needed. In this project the control of an activated sludge biological treatment will be studied. In all waste water treatment plants (WWTP), two different lines co-exist, the water and sludge lines. In water line different treatments are produced: First of all a pre-treatment, where the largest solids are removed, followed by the primary treatment a clarification, settling and decanting process. Finally there is a secondary treatment or biological treatment, in which this project is based on. This treatment is in charge of reducing the BOD (Biological Oxygen Demand) value below the limit set by the European Union (BOD<25 mg / L). | es_ES |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3308 Ingeniería y tecnología ambiental | es_ES |
dc.subject | 330806 Regeneración del agua | es_ES |
dc.title | Modelo de simulación y control de un proceso de fangos activos | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
Aparece en las colecciones: | KL0-Trabajos Fin de Grado |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFG001469.pdf | Trabajo fin de grado | 2,28 MB | Adobe PDF | Visualizar/Abrir |
TFG001469 Autorizacion.pdf | Autorización | 481,91 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.