Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/6680
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Martín Serrano, Javier | - |
dc.contributor.author | Andueza Latasa, Luis Miguel | - |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2016-03-08T08:49:55Z | - |
dc.date.available | 2016-03-08T08:49:55Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | http://hdl.handle.net/11531/6680 | - |
dc.description | Ingeniero Industrial | es_ES |
dc.description.abstract | El objetivo de este proyecto consiste en climatizar un centro comercial situado en Badajoz, respetando todas las condiciones técnicas y legales establecidas. El sistema de climatización está diseñado para vencer las condiciones más desfavorables, tanto en invierno como en verano. El edificio consta de una planta baja, donde se encuentran todas las zonas que se van a climatizar, y una cubierta donde se situaran los equipos de la instalación. Tanto la planta como la cubierta tienen una superficie de 56944,43 m2. La planta baja consta de una de oficinas y una zona de pasillos o zonas comunes del centro comercial, en las cuales se realizara la instalación de climatización, 94 locales comerciales, los cuales no se van a climatizar, pero si se les suministrara el agua fría y caliente necesaria para que se instale los equipos necesarios para su climatización y unas zonas que no se realizara instalación alguna como pueden ser baño, salidas de incendios o garajes de descarga de mercancías. Las condiciones más desfavorables en verano dependen de la orientación de la fachada de las superficies a climatizar, mientras que en invierno estas condiciones son independientes de la orientación. Se han establecido unas condiciones de confort en los locales climatizados de 24ºC y 50 % de humedad relativa en verano y 22ºC y 50 % de humedad relativa en invierno. Para el cálculo de cargas térmicas en verano se han considerado las producidas por trasmisión entre el exterior y las zonas climatizadas así como entre las zonas climatizadas y zonas interiores no climatizadas, las cargas producidas por radiación solar, cargas producidas por las personas que se encuentran en el edifico, cargas por iluminación y las producidas por los equipos. En el caso de pérdidas en invierno se han tenido en cuenta las pérdidas producidas por la trasmisión entre las zonas climatizadas y el exterior y las pérdidas por trasmisión entre zonas no climatizadas y zonas climatizadas. En ninguno de las situaciones desfavorable se ha tenido en cuenta la infiltración de aire exterior ya que se ha sobrepresionado todas las zonas climatizadas. Una vez realizados todos los cálculos de potencias caloríficas y frigoríficas, caudales de aire y de agua, se han dimensionado los equipos y diseñado una red de conductos y de una red de tuberías. La instalación consta de una caldera y un grupo frigorífico para climatizar las zonas comunes y las oficinas, 4 calderas y 8 grupos frigoríficos para enfriar y calentar el agua destinada a las instalaciones de los locales comerciales, 50 bombas para impulsar el agua fría y caliente, 8 fan-coils para la climatización de las oficinas y los despachos, 5 climatizadores, 4 para la climatización de las zonas comunes del centro comercial y uno para un pre-tratamiento del aire exterior de los fan-coils. También cuenta dos redes de tuberías de impulsión de agua fría y caliente y dos redes de agua fría y caliente de retorno, una red de conductos de impulsión del aire de los climatizadores y una red de conductos de aire de retorno, así como difusores y rejillas para impulsar o extraer el aire de las salas. Se han determinado algunos accesorios complementarios como son las válvulas o equipos de medida para un buen funcionamiento de la instalación. El presupuesto final de la instalación asciende a 9.975.622,16 € (NUEVE MILLONES NOVECIENTOS SETENTA Y CINCO MIL SEISCIENTOS VEINTIDÓS EUROS Y DIECISEIS CENTIMOS). | es_ES |
dc.description.abstract | The objective of this project is to acclimatize a mall located in Badajoz, respecting all established technical and legal conditions. The air conditioning system is designed to overcome the most unfavorable conditions in both winter and summer. The building consists of a ground floor where are all areas that are to be heated, and a deck where the installation teams will be placed. Both the plant and the cover have an area of 56944.43 m2. The ground floor consists of an office and an area of corridors or common areas of the shopping center, where the air conditioning took place, 94 commercial premises, which are not going to be air conditioned, but if they supply the cold water Hot and necessary for the equipment needed for air conditioning and some areas that do not perform any installation such as bathroom, fire exits or unloading goods garages is installed. The most unfavorable conditions in summer depend on the orientation of the facade of the surfaces to be heated, while in winter these conditions are independent of direction. They have established conditions of comfort in the air-conditioned premises of 24ºC and 50% RH in summer and 22 ° C and 50% relative humidity in winter. For the calculation of summer thermal loads have been considered caused by transmission between the outside and the air and between heated and unheated areas hinterland areas, loads produced by solar radiation, loads produced by people who are in the building, lighting and loads produced by the teams. In the case of winter losses they were taken into account losses from transmission between the heated areas and outside and transmission losses between zones not heated and air-conditioned. In none of the unfavorable situation has been taken into account infiltration of outside air as it has overpressured all air-conditioned. When all the calculations of heat and cooling capacities, flow of air and water, are sized and designed equipment ductwork and a network of pipes. The facility consists of a boiler and refrigeration unit to heat the common areas and offices, 4 boilers and 8 refrigeration units for cooling and heating water for the facilities of the premises, 50 pumps to drive the hot and cold water, 8 fan coil units for air conditioning offices and offices, five air conditioners, 4 for the air conditioning in the common areas of the shopping center and one for pre-treatment of outdoor air in the fan-coils. It also has two networks of pipes pumping cold and hot water and two networks of cold and hot water return, a network drive duct air conditioners and a network of return air ducts and diffusers and grilles to push or pull air from the rooms. They have given some complementary accessories such as valves or measuring equipment for proper operation of the facility. The final budget for the facility amounts to € 9,975,622.16 (NINE MILLION NINE HUNDRED SEVENTY-FIVE THOUSAND THREE HUNDRED TWENTY EUROS AND SIXTEEN CENTS). | es_ES |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3313 Tecnología e ingeniería mecánica | es_ES |
dc.subject | 331326 Equipo de refrigeración | es_ES |
dc.title | Climatización de un centro comercial en Badajoz | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
Aparece en las colecciones: | ICAI - Proyectos Fin de Carrera |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
PFC000412.pdf | Proyecto fin de carrera | 5,66 MB | Adobe PDF | Visualizar/Abrir |
PFC000412 Autorizacion.pdf | Autorización | 636,34 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.