Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/68092
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Matanza Domingo, Javier | es-ES |
dc.contributor.advisor | García Gallem, Diego | es-ES |
dc.contributor.author | Guisasola Montes, Fernando | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2022-05-09T20:46:34Z | - |
dc.date.available | 2022-05-09T20:46:34Z | - |
dc.date.issued | 2022 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/68092 | - |
dc.description | Máster Universitario en Ingeniería Industrial + Máster in Smart Grids | es_ES |
dc.description.abstract | Este documento analiza los detalles de la funcionalidad de PRIME y la situación de la AMI de Iberdrola para ofrecer diferentes estrategias de planificación para el despliegue de nuevos activos en la AMI en la Red de Distribución de BT de Iberdrola. Se realizan diferentes simulaciones en Matlab para determinar la solución óptima técnicamente viable. Se desarrolla una planificación final que incurre en un incremento del coste de inversión del 1,3% al acelerar el despliegue de PRIME v1.4 con el uso de dispositivos con funcionalidades Dual-Stack. | es-ES |
dc.description.abstract | This document analyses the details of PRIME functionality and the situation of Iberdrola’s AMI to offer different planning strategies for the deployment of new AMI in Iberdrola’s Spanish LV Distribution Grid. Different simulations are performed in Matlab to determine the optimal technically viable solution. A final planning is developed incurring in a mere 1.3% investment cost increase by accelerating the deployment of PRIME v1.4 with the use of devices with Dual-Stack capabilities. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3311 Instrumentación tecnológica | es_ES |
dc.subject | 331102 Ingeniería de control | es_ES |
dc.subject.other | M8E | es_ES |
dc.title | New Generation of Smart Metering Deployment Planning, with PRIME v1.4 | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/closedAccess | es_ES |
dc.keywords | AMI, Contadores inteligentes, Dual-Stack, NB-PLC, PRIME v1.4, Redes Inteligentes. | es-ES |
dc.keywords | AMI, Dual-Stack, NB-PLC, PRIME v1.4, Smart Grids, Smart Metering. | en-GB |
Aparece en las colecciones: | M8E - Trabajos Fin de Máster |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFM-Guisasola Montes, Fernando.pdf | Trabajo Fin de Máster | 611,7 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.