Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/69835
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMartín Gutiérrez, Ignacioes-ES
dc.contributor.authorTorres-Quevedo Oliver, Alejandraes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-07-07T15:22:56Z-
dc.date.available2022-07-07T15:22:56Z-
dc.date.issued2023es_ES
dc.identifier.urihttp://hdl.handle.net/11531/69835-
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractLa revolución industrial es un proceso de cambio económico, social e industrial que se inició en el SXVII. Uno de los cambios que tuvieron más importancia fue el comienzo de la utilización de carbón y más adelante durante el siglo XX, el petróleo. Durante los años se ha ido observando como la emisión de CO2 es un factor determinante en el denominado “efecto invernadero” y como la continua combustión de fósiles acelera el cambio climático. Además, los pozos petrolíferos, de gas o de carbón son limitados. El objetivo principal del proyecto es generar energía limpia para reducir el consumo de fósiles y con ello la generación de C02. A la crisis medioambiental se le suma una crisis política que comenzó la guerra en Ucrania contra Rusia. Europa ha sufrido una crisis eléctrica al depender principalmente de Rusia. Esto ha producido un desnivel en la oferta y demanda disparando los precios de la electricidad. La creación de parque eólicos que aumenten la cantidad de energía limpia disponible disminuye la dependencia con un solo país y permite fijar un precio más estable sobre un bien tan esencial como la energía. Se quiere producir lo suficiente para abastecer las ciudades cercanas al emplazamiento, Skelund, Als y Hadsun. El proyecto tendrá lugar en una zona al noreste de Dinamarca, cerca de un pueblo llamado Skelund. Esta pequeña ciudad pertenece a la región de Jutlandia septentrional y se encuentra a unos 190km al noroeste de la capital, Copenhague. Este emplazamiento se beneficia de vientos fuertes del Oeste con una velocidad media constante de 9.67 m/s. El tamaño del emplazamiento seleccionado es aproximadamente 2 〖km〗^2 y en él se distribuirán 8 turbinas de 5.7 MW. La turbina que se utilizará es la Nordex 163/5.7. La potencia total instalada del parque será de 45.6 MW.es-ES
dc.description.abstractIndustrial revolution is a process of social, economic, and industrial change which started in the seventeenth century. One of the most important changes was the beginning of coal as a fuel, and later in the twentieth century, oil. During all these years it has been observed that C02 emissions are a determining factor in the greenhouse gas effect, and it has been shown that the use of fossil for combustion accelerates climate change. Additionally, oil, gas and coal wells are limited. The main objective of the project is to generate clean energy, to reduce the consumption of fossil fuels and with it the generation of C02. In addition to the environmental crisis, there is a political crisis that started the war in Ukraine against Russia. Europe has suffered an electricity crisis due to its dependence mainly on Russia. This has produced a difference in supply and demand, causing electricity prices to skyrocket. The creation of wind farms that increase the amount of clean energy available decreases dependence on a single country and allows a more stable price to be set for such an essential commodity as energy. The aim is to produce enough to supply the nearby towns of Skelund, Als and Hadsun. The project will take place in an area northeast of Denmark, near a town named Skelund. This small town belongs to the North Jutland region and is located 190 Km northwest of the capital, Copenhaguen. The site benefits from strong westerly winds with a constant average wind speed of 9.67 m/s. The size of the selected site is approximately 2 〖km〗^2 and 8 turbines of 5.7 MW will be distributed on the site. The turbine to be used is the Nordex 163/5.7. The total capacity installed of the wind farm will be 45.6 MW.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleEvaluación de la creación de un parque eólico/solar (Go-No Go)es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsParque eólico, Aerogeneradores, Energía, renovable, Diseño, Viabilidades-ES
dc.keywordsWind farm, wind turbines, Renewable, energy, Design, Feasibilityen-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG-Torres-Quevedo Oliver Alejandra.pdfTrabajo Fin de Grado7,28 MBAdobe PDFVisualizar/Abrir
ANEXO I.pdfAutorización263,98 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.