Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/69907
Título : | A business plan to achieve full electrification in Rwanda under the Integrated Distribution Framework (IDF) |
Autor : | de Abajo Llamero, Carlos Pérez Arriaga, José Ignacio Díaz Pastor, Santos-José González García, Andrés |
Fecha de publicación : | 1-jul-2020 |
Resumen : | El Gobierno de Ruanda ha establecido un Plan Estratégico Nacional del Sector Energético ambicioso e integral, que incluye un objetivo de electrificación del 100% para 2024, destinado a contribuir al crecimiento económico y el alivio de la pobreza. Con el apoyo de múltiples socios para el desarrollo, Ruanda ha acelerado con éxito la tasa de acceso a la electricidad durante la última década, que aumentó del 10 % en 2010 al 43 % en 2018, casi exclusivamente mediante la extensión de la red. Pero el ritmo de extensión de la red es insuficiente para lograr el objetivo de acceso establecido, y existen soluciones fuera de la red menos costosas para satisfacer la demanda estimada de muchos de los clientes que aún no tienen electricidad. El Laboratorio de Acceso Universal MIT-Comillas, utilizando su software de planificación de electrificación REM y con financiación del Banco Mundial, ha contribuido al esfuerzo de electrificación desarrollando un Plan Director de Electrificación para todo el país. The Government of Rwanda has established an ambitious and comprehensive National Energy Sector Strategic Plan, which includes a 100% electrification target by 2024, meant to contributing to economic growth and poverty alleviation. With the support of multiple development partners, Rwanda has successfully accelerated the rate of access to electricity during the last decade, which has increased from 10% in 2010 to 43% in 2018, almost exclusively by grid extension. But the pace of grid extension is insufficient to achieve the established access target, and there are less expensive off-grid solutions to meet the estimated demand of many of the still nonelectrified customers. The MIT-Comillas Universal Access Laboratory, using its electrification planning software REM and with funding from the World Bank, has contributed to the electrification effort by developing a Master Electrification Plan for the entire country. |
Descripción : | Informe técnico |
URI : | http://hdl.handle.net/11531/69907 |
Aparece en las colecciones: | Memorias e informes de investigación |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
2021-03-03-Background for the Rwanda electrification business plan-CLEAN-format.pdf | 1,26 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.