Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/72404
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Alonso Alonso, Consolación | es-ES |
dc.contributor.author | Gaudó Ester, Yolanda | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2022-09-06T12:00:46Z | |
dc.date.available | 2022-09-06T12:00:46Z | |
dc.date.issued | 2023 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/72404 | |
dc.description | Grado en Ingeniería en Tecnologías Industriales | es_ES |
dc.description.abstract | El proceso de instalación del parque eólico ha seguido una serie de etapas rigurosas. En primer lugar, se ha seleccionado el emplazamiento del parque, siguiendo criterios obligatorios para maximizar la utilización del recurso eólico, preservar la flora y fauna, y garantizar la seguridad. La ubicación elegida nos lleva a las proximidades del municipio de Villanueva de Gállego, en Zaragoza. Posteriormente, se ha realizado un análisis del recurso eólico, con la ayuda de la empresa VORTEX, que ha proporcionado las series de datos de viento. Estas mediciones se han utilizado en el software Windographer para llevar a cabo un estudio estadístico del comportamiento del viento. A continuación, se han recopilado los archivos necesarios para el software WAsP, que incluyen la ubicación de los aerogeneradores, mapas topográficos y de rugosidad, curvas de potencia y coeficiente de empuje, y datos de viento. Estos datos se han necesitado para simular el parque eólico con tres tecnologías de aerogenerador diferentes. Una vez que WAsP ha modelado el funcionamiento del parque, se han obtenido resultados clave como la producción anual y las pérdidas debidas al efecto estela. Esto ha permitido determinar que el aerogenerador de Siemens Gamesa, es el más eficiente. A partir de este momento, se inicia el desarrollo de la obra civil, que abarca desde los accesos al parque hasta la instalación eléctrica necesaria para entregar la energía generada a la red. Simultáneamente al diseño de las obras e instalaciones, que se ajustan a los reglamentos establecidos en el Pliego de Condiciones, se ha realizado el presupuesto de ejecución necesario. La construcción del parque eólico, que requiere de una inversión total de 47.146.176,22 €, se ha demostrado como un proyecto rentable. Se ha obtenido un WACC de 5,85 % VAN de 10.215,81 k€, un TIR de 8,30 % y un Payback de 10 años. | es-ES |
dc.description.abstract | The installation process of the wind farm has followed a series of rigorous steps. Firstly, the site selection has been carefully conducted based on specific criteria to maximize the utilization of the wind resource, preserve flora and fauna, and ensure safety. The chosen location is in the vicinity of Villanueva de Gállego, Zaragoza. Subsequently, an analysis of the wind resource was conducted with the assistance of VORTEX, which provided wind data series. These measurements were utilized in the Windographer software to perform a statistical study of wind behavior in the area. Next, the necessary files for the WAsP software were compiled and prepared. These files include the turbine locations, topographic and roughness maps, power and thrust coefficient curves, and wind data. These data are required for simulating the wind farm with three different wind turbine technologies. Once the WAsP software modeled the wind farm ´s operation, key results such as annual production and wake losses were obtained. This has allowed determining that the Siemens Gamesa wind turbine is the most efficient. From this point onwards, the civil works development commenced, including the construction of access roads and the installation of electrical infrastructure to deliver the generated energy to the grid. Simultaneously with the design of the works and facilities, which comply with the regulations established in the Specifications, the necessary budget for execution has been prepared. The construction of the wind farm, which requires a total investment of 47.146.176,22 €, has been proven to be a profitable project. A WACC of 5,85 %, a NPV of 10.215,81 k€, an IRR of 8,30 %, and a Payback period of 10 years have been obtained. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es-ES | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3306 Ingeniería y tecnología eléctrica | es_ES |
dc.subject | 330609 Transmisión y distribución | es_ES |
dc.subject.other | KTI-electricidad (GITI-E) | es_ES |
dc.title | Proyecto de ejecución de un parque eólico terrestre en España | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
dc.keywords | EÓLICO, CURVAS ISOVENTAS, ROSA DE LOS VIENTOS y LÍNEAS DE GENERACIÓN. | es-ES |
dc.keywords | WIND, ISOVENTS CURVES, WIND ROSE AND GENERATION LINES. | en-GB |
Aparece en las colecciones: | KTI-Trabajos Fin de Grado |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
Gaudo Ester, Yolanda.pdf | Trabajo Fin de Grado | 11,62 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.