Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/73477
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorNúñez Salamanca, Paulaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-09-16T06:14:14Z
dc.date.available2022-09-16T06:14:14Z
dc.date.issued2023es_ES
dc.identifier.urihttp://hdl.handle.net/11531/73477
dc.descriptionGrado en Administración y Dirección de Empresas y Máster Universitario en Ingeniería Industriales_ES
dc.description.abstractEste proyecto se centra en el diseño de un sistema de climatización para un edificio de oficinas situado en la ciudad de Toledo, siguiendo la normativa vigente hasta el momento. El trabajo desarrollado se divide en cuatro documentos que recogen toda la información necesaria acerca del cálculo e instalación del sistema en cuestión. Estos documentos son: la Memoria, los Planos, el Presupuesto y el Pliego de Condiciones. El edificio objeto del proyecto presenta una base rectangular con ocho plantas sobre rasante y cuatro plantas bajo rasante, donde se encuentran los garajes. Estos, junto con los baños y los casetones en la séptima planta se consideran como locales no climatizados (LNC), resultando en una superficie por climatizar de 3.998,64 m2. En primer lugar, se establecen las condiciones exteriores según la normativa y su ubicación, y las condiciones interiores requeridas por el reglamento. Se procede a obtener las cargas térmicas que el sistema de climatización deberá hacer frente en verano y en invierno. A partir de esos datos, se decide instalar un sistema aire-agua, formado por una red hidraúlica encargada de transportar el agua fría y caliente a los equipos interiores de las salas, que serán los fan-coils, los cuales recibirán el aire desde la UTA a través de la red de conductos, gestionando el intercambio de energía entre ambos fluidos e impulsando el aire con las nuevas condiciones adquiridas a las propias estancias del edificio. Se dimensionan las tuberías, conductos, enfriadora, caldera, UTA y elementos adicionales según la normativa para el correcto funcionamiento del sistema. En los Planos se recoge una representación visual de la distribución de ambas redes, junto con las conexiones a los equipos de generación, fan-coils y UTA necesarias. En el Pliego de Condiciones se incluyen las especificaciones técnicas de los equipos y la obra de instalación. El presupuesto total del proyecto alcanza, finalmente, unos 754.883,76 €.es-ES
dc.description.abstractThis project focuses on the design of an air conditioning system for an office building located in the city of Toledo, following the current regulations. The work developed is divided into four documents that gather all the necessary information about the calculation and installation of the system in question. These documents are: the Report, the Plans, the Budget and the Specifications. The building is a rectangular base with eight floors above ground level and four floors below ground level, where the garages are located. These, together with the bathrooms and the cassettes on the seventh floor, are considered as non-air-conditioned premises, resulting in an area of 3,998.64 m2 to be air-conditioned. First, the exterior conditions are established according to the regulations and their location, and the interior conditions required by the regulations. The thermal loads that the air conditioning system will have to face in summer and winter are obtained. From these data, it is decided to install an air-water system, consisting of a hydraulic network responsible for transporting hot and cold water to the interior equipment of the rooms, which will be the fan coils, which will receive the air from the AHU through the duct network, managing the energy exchange between the two fluids and driving the air with the new conditions acquired to the rooms of the building. Piping, ducts, chiller, boiler, AHU and additional elements are dimensioned according to the regulations for the correct operation of the system. A visual representation of the distribution of both networks, together with the connections to the necessary generation equipment, fan-coils and AHUs, is shown in the Plans. The technical specifications of the equipment and the installation work are included in the Technical Specifications. The total budget for the project is 754,883.76 €.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicases_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject.otherH62-mecanica (MII-M)es_ES
dc.titleDesarrollo del sistema completo de climatización de un edificio a definir en Toledoes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsSistema de climatización, Aire-agua, Fancoil, Enfriadora, Calderaes-ES
dc.keywordsAir conditioning system, Air-water, Fancoil, Chiller, Boileren-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
ANEXO I.pdfAutorización33,09 kBAdobe PDFVista previa
Visualizar/Abrir
TFM- Nunez Salamanca, Paula.pdfTrabajo Fin de Máster7,76 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.