Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/74727
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorPaneque Buiza, Pabloes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-10-19T09:57:19Z-
dc.date.available2022-10-19T09:57:19Z-
dc.date.issued2023es_ES
dc.identifier.urihttp://hdl.handle.net/11531/74727-
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEn este trabajo se ha realizado un estudio para la climatización de un edificio de oficinas en Albacete. El proceso ha empezado seleccionando las condiciones climáticas adecuadas con las que calcular las cargas térmicas de las estancias de cada edificio. Luego, se ha elegido el número de fancoils que debe haber en cada estancia teniendo en cuenta el las cargas térmicas de verano y de invierno. Seguidamente, se ha diseñado la red de tuberías por donde discurrirá el agua fría y caliente desde los equipos de producción de frío y calor hasta los fancoils. Se han diseñado las bombas de recirculación calculando la pérdida de carga máxima de cada circuito. El siguiente paso ha sido definir la red de conductos por donde circulará el aire hasta los fancoils. Se han calculado los diámetros y secciones equivalentes de todas las tuberías y conductos. Una vez se tiene clara la red de tuberías y conductos, se ha procede a diseñar los equipos de producción de frío y calor, además de las unidades de tratamiento de aire y los elementos de difusión y retorno de aire. El presupuesto de toda la instalación ha ascendido a un valor de 2.128.381,44 euros.es-ES
dc.description.abstractIn this work, a study has been conducted for the air conditioning of an office building in Albacete. The process began by selecting the appropriate climatic conditions to calculate the thermal loads of each building's rooms. Then, the number of fan coils required in each room was determined, taking into account the thermal loads in both summer and winter. Subsequently, the network of pipes was designed to allow the flow of cold and hot water from the cooling and heating production equipment to the fan coils. Recirculation pumps were designed, considering the maximum head loss of each circuit. The next step involved defining the network of ducts through which the air will circulate to reach the fan coils. The diameters and equivalent sections of all pipes and ducts were calculated. Once the pipe and duct network was clear, the design of the cooling and heating production equipment was carried out, along with the air handling units and the air distribution and return elements. The total budget for the entire installation amounted to 2,128,381.44 euros.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un edificio de oficinas en Albacetees_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordstubería, conducto, fancoil, climatizadores-ES
dc.keywordspipe, duct, fancoil, climatizeren-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG - Paneque Buiza, Pablo.pdfTrabajo Fin de Grado9,61 MBAdobe PDFVista previa
Visualizar/Abrir
Anexo I - Paneque Buiza, Pablo.pdfAutorización214,96 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.