Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/75477
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSánchez Mingarro, Matías Juanes-ES
dc.contributor.authorConde Poole, Almudenaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-11-13T12:19:10Z-
dc.date.available2022-11-13T12:19:10Z-
dc.date.issued2023es_ES
dc.identifier.urihttp://hdl.handle.net/11531/75477es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl proyecto buscará la tramitación oficial de una subestación de 400kV con el objetivo de evacuar energía procedente de plantas fotovoltaicas a la red de transporte, lo que permitirá ampliar el mallado de la misma. Su emplazamiento se dará en el municipio de Campillo de Llerena, en Badajoz. El diseño de la subestación se ejecuta bajo lo estipulado en el Real Decreto 337/2014, del 9 mayo. La tecnología seleccionada para la subestación será de tipo AIS, debido a las condiciones ambientales de la zona, reduciendo de esta manera el coste de la instalación. Para la configuración se escogerá la de interruptor y medio. El parque estará compuesto por 4 calles, con 5 posiciones equipadas y 3 de reserva. La aparamenta que conformará la subestación será la siguiente: ·Interruptores de potencia trifásicos ·Seccionadores trifásicos de barras (tipo pantógrafo) ·Seccionadores trifásicos de línea (de tres columnas con y sin puesta a tierra) ·Transformadores de intensidad monofásicos ·Transformadores de tensión capacitivos monofásicos ·Aisladores · Autoválvulas Se escogerán bajo las especificaciones eléctricas de la subestación las cuales se recogerán en el proyecto. Se detallará la obra civil a realizar para lo que se tendrá en cuenta la normativa vigente. También se contemplarán los drenajes y saneamientos, cimentaciones y edificaciones. Además, se diseñarán los sistemas de control y protecciones, el sistema de telecomunicaciones y los servicios auxiliares. Será necesario también un sistema de alumbrado tanto para el parque exterior como para el interior de los edificios, un sistema contra incendios en caso de fallo y un sistema anti-intrusismo para evitar la entrada de personas ajenas al personal autorizado. Se detallarán los cálculos necesarios y se presentarán los planos adecuados. Se realiza, además, un presupuesto de inversión inicial el cual asciende a 7.410.571€, obteniendo, tras un estudio económico, que la rentabilidad es del 36%.es-ES
dc.description.abstractThe project will seek the official processing of a 400kV substation with the aim of evacuating energy from photovoltaic plants to the transmission grid, which will help to expand its meshing. It will be located in the municipality of Campillo de Llerena, in Badajoz. The design of the substation is executed under the provisions of Royal Decree 337/2014, of May 9. The technology selected for the substation will be the AIS type, because of the environmental conditions, reducing the cost of the installation. For the bus configuration, the switch and a half will be chosen. The switchyard will be composed of 4 bays, in which there will be 5 equipped positions and 3 reserve positions. The switchgear that will make up the substation will be the following: · Three-phase power breaks · Three-phase bar disconnectors (pantograph disconnectors) · Three-phase line disconnectors (double-side break disconnectors with and without earthing) · Single-phase current transformers · Single-phase capacitive voltage transformers · Insulators · Autovalves They will be chosen under the electrical specifications of the substation which will be included in the project. The civil works to be carried out will be detailed, for which the current regulations will be taken into account. Drainage and sanitation, foundations and buildings will also be considered. In addition, the control and protection systems, the telecommunications system and auxiliary services will be designed. It will also be necessary a lighting system for both the switchyard and the interior of the buildings, a fire system in case of failure and an anti-intrusion system to prevent the entry of people outside the authorized personnel. The necessary calculations shall be detailed and appropriate drawings submitted. In addition, an initial investment budget is made which amounts to 7.410.571€, obtaining after an economic study that the profitability is 36%.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleSubestación de evacuación de generación en zona rurales_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsSubestación, interruptor y medio, AIS, aparamenta.es-ES
dc.keywordsSubestation, switch and a half, AIS, switchgearen-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Trabajo de fin de grado Almudena Conde Poole.pdfTrabajo Fin de Grado7,24 MBAdobe PDFVisualizar/Abrir
AnexoI.pdfAutorización165,36 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.