Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/77266
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Cepeda Fernández, Fernando | es-ES |
dc.contributor.author | Díaz-Lladó Centeno, Sofía María | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2023-02-28T06:41:04Z | - |
dc.date.available | 2023-02-28T06:41:04Z | - |
dc.date.issued | 2023 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/77266 | - |
dc.description | Máster Universitario en Ingeniería Industrial | es_ES |
dc.description.abstract | El objetivo de este proyecto ha sido diseñar las instalaciones de climatización para un centro de investigación en Málaga, cumpliendo con los requisitos del Reglamento de Instalaciones Térmicas de los Edificios (RITE). Se ha enfocado en climatizar el edificio principal, que consta de cuatro plantas, mientras que los detalles de los otros dos edificios industriales no se han especificado. Se establecieron condiciones interiores adecuadas para garantizar el confort de las personas durante el verano y el invierno. En verano, se buscó una humedad relativa del 45-60% y una temperatura interior de 23-25°C. En invierno, se estableció una temperatura interior de 21-23°C y una humedad relativa mínima según el RITE. Se realizaron cálculos de cargas considerando las condiciones más desfavorables tanto en verano como en invierno, teniendo en cuenta las cargas por transmisión, radiación, calor generado por las personas, el alumbrado y los equipos. Para el dimensionamiento de tuberías, se consideraron las pérdidas de carga de cada circuito y se seleccionaron las bombas centrífugas adecuadas. La red de tuberías incluye dos circuitos de agua caliente y dos circuitos de agua fría para los climatizadores y fancoils. Se dimensionaron los conductos de aire, determinando el caudal necesario en cada habitación y las pérdidas de carga de la red. Se seleccionaron equipos adecuados, incluyendo unidades de climatización, fancoils de techo, difusores rotacionales, lineales y rejillas de extracción, así como bombas en línea para el suministro de agua caliente y fría. Los anexos del proyecto contienen las características de los equipos seleccionados, los procedimientos de cálculo, los planos de las instalaciones, el presupuesto completo y el Pliego de Condiciones. El presupuesto total del proyecto es de 1,509,303.25 €. | es-ES |
dc.description.abstract | The goal of this project has been to design the air conditioning installations for a research center in Malaga, complying with the requirements of the Regulation of Thermal Installations in Buildings (RITE). It has been focused on air conditioning the main building, which consists of four floors, while the details of the other two industrial buildings have not been specified. Suitable indoor conditions were established to ensure people's comfort during summer and winter. In summer, a relative humidity of 45-60% and an indoor temperature of 23-25°C were sought. In winter, an indoor temperature of 21-23°C and a minimum relative humidity according to RITE were established. Load calculations were made considering the most unfavorable conditions both in summer and winter, taking into account the loads due to transmission, radiation, heat generated by people, lighting and equipment. For pipe sizing, the head losses of each circuit were considered and the appropriate centrifugal pumps were selected. The piping network includes two hot water circuits and two cold water circuits for the air conditioners and fan coils. The air ducts were sized, determining the flow rate required in each room and the network head losses. Suitable equipment was selected, including air conditioning units, ceiling fan coils, swirl diffusers, linear diffusers and extraction grilles, as well as in-line pumps for hot and cold water supply. The project annexes contain the characteristics of the selected equipment, the calculation procedures, the installation drawings, the complete budget and the specifications. The total project budget is €1,509,303.25. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es-ES | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject.other | H62-mecanica (MII-M) | es_ES |
dc.title | Climatización de un Centro de Investigación, en la ciudad de Málaga | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
dc.keywords | climatización, temperatura, dimensionamiento, climatizadores | es-ES |
dc.keywords | temperature, sizing, air conditioning, air conditioners | en-GB |
Aparece en las colecciones: | H62-Trabajos Fin de Máster |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
TFM-Diaz-Llado Centeno Sofia.pdf | Trabajo Fin de Máster | 15,88 MB | Adobe PDF | Visualizar/Abrir |
ANEXO I TFM FIRMADO.pdf | Autorización | 87,85 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.