Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/78663
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMartín Gutiérrez, Ignacioes-ES
dc.contributor.authorTorija Valle, Fernandoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2023-06-09T11:39:43Z-
dc.date.available2023-06-09T11:39:43Z-
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/78663es_ES
dc.descriptionMáster Universitario en Ingeniería Industrial + Máster en Industria Conectada / in Smart Industryes_ES
dc.description.abstractSe diseña una planta de 6,13 MW usando 10858 paneles monocristalinos bifaciales de 565 W. Se instalan 1 inversor para toda la planta (con una potencia nominal equivalente al c.80% de la potencia máxima de la planta), y se evacúa la energía a través de 2 transformadores de 2500 kVA cada uno. A nivel económico, para el caso sin seguidores, se obtienen un VAN de 2,8 M€, un ROI del 344,50% y una TIR del 14,41% (vs. una tasa de interés del 6%). Se ve también que la instalación de seguidores es rentable hasta una inversión máxima de 164 €/panel. El proyecto es por tanto rentable. Se ha visto que, si bien es rentable, el clima económico actual no es el idóneo, pudiendo obtenerse una mejora del VAN de hasta el 75% si se invirtiera en otro momento.es-ES
dc.description.abstractA 6,13 MW plant is designed, using 10 858 bifacial and monocrystalline panels of 565 W each. All the plant is covered by 1 inverter (with a power capacity of c.80% of the plant’s maximum) and 2 transformers of 2 500 kVA each. Economically, for the no-trackers case, a NPV of 2.8 M€,a 344.50% ROI and a 14.41% IRR (vs. 6% discount rate) are obtained. It is also seen that the installation of trackers is feasible up to a maximum investment of 164 €/panel. The project is therefore feasible. It has been seen that, although it’s economically beneficial, the current economic environment is not ideal. A 75% increase in the NPV can be achieved if the investment was to take place at a different moment.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-electrotecnica (MII-E)es_ES
dc.titleEvaluación técnica/económica de un parque solar en los Perdigones (Galápagos, Guadalajara)es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsGalápagos, Guadalajara, fotovoltaico, viabilidad, tecnológico, económico, rentabilidad, diseñoes-ES
dc.keywordsGalápagos, Guadalajara, photovoltaic, feasibility, technological, economical, profitability, designen-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM - Torija Valle, Fernando.pdfTrabajo Fin de Máster4 MBAdobe PDFVista previa
Visualizar/Abrir
Anexo I - Fernando Torija Valle.pdfAutorización208,42 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.