Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/82746
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Alonso Alonso, Consolación | es-ES |
dc.contributor.author | Clemente Martín, Sergio | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2023-09-08T16:24:07Z | - |
dc.date.available | es_ES | |
dc.date.issued | 2024 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/82746 | es_ES |
dc.description | Máster Universitario en Ingeniería Industrial y Máster Universitario en Sector Eléctrico - Master in the Electric Power Industry | es_ES |
dc.description.abstract | El TFM trata sobre la ejecución de un parque eólico en Quintanilla Vivar, Burgos. La capacidad total del parque son 42 MW, contando con 7 aerogeneradores de 6 MW cada uno y un rotor de 170 metros de diámetro. El recurso energético obtenido es de 175 GWh/año, siendo su energía bruta de 198 GWh/año. Para que sea viable económicamente se decide cerrar un PPA de perfil fijo (de energía anual baseload igual a la vertida a la red) y de precio fijo a 50 €/MWh. En el proyecto se calcula también la instalación eléctrica, agrupando los aerogeneradores en tres circuitos, con secciones de 240 y 400 mm2. Se diseña una subestación de 30/220 kV para poder transportar la energía del parque a la red de distribución. | es-ES |
dc.description.abstract | The Master Thesis deals with the execution of a wind farm in Quintanilla Vivar, Burgos. The total capacity of the wind farm is 42 MW, with 7 wind turbines of 6 MW each and a rotor diameter of 170 metres. The energy resource obtained is 175 GWh/year, being its gross energy 198 GWh/year. In order to make it economically viable, it was decided to close a fixed profile PPA (annual baseload energy equal to the energy fed into the grid) and a fixed price of 50 €/MWh. The project also calculates the electrical installation, grouping the wind turbines into three circuits, with sections of 240 and 400 mm2. A 30/220 kV substation is designed to transport the wind farm's energy to the distribution network. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es-ES | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject.other | H62-electrotecnica (MII-E) | es_ES |
dc.title | Proyecto de ejecución de un parque eólico terrestre de 42 MW localizado en Quintanilla Vivar (Burgos) | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
dc.keywords | Energía, parque eólico, PPA, renovables, sostenibilidad | es-ES |
dc.keywords | Energy, wind farm, PPA, renewable energy, sustainability | en-GB |
Aparece en las colecciones: | H62-Trabajos Fin de Máster |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
signed_TFM MIII Sergio Clemente Martin.pdf | Trabajo Fin de Máster | 8,42 MB | Adobe PDF | Visualizar/Abrir |
AnexoI TFM MII.pdf | Autorización | 44,8 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.