Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/83387
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAlonso Alonso, Consolaciónes-ES
dc.contributor.authorSilva López, Javieres-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2023-09-23T11:37:37Z-
dc.date.available2023-09-23T11:37:37Z-
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/83387es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEn este trabajo se ha desarrollado un parque eólico terrestre en España. Para la elección de este emplazamiento, en primer lugar, se hizo un análisis superficial de tres ubicaciones distintas. Una vez realizado este primer análisis, se seleccionó el que cumplía los requisitos y obtenía más puntos en base a un sistema de puntuación que valoraba distintas cualidades del emplazamiento, como la velocidad media del terreno, la orografía y vegetación de esta o su cercanía a una subestación de alta tensión, entre otras. Una vez seleccionado el terreno se realizó un estudio energético, en el que se compararon 3 aerogeneradores de empresas distintas y se obtuvo la energía neta producida por cada uno, quedándose con el que daba mayor valor. Teniendo en cuenta las pérdidas que existen en el proceso de transporte de energía a la red, se obtuvo la energía neta vertida a la red. Una vez seleccionados los aerogeneradores se desarrolló toda la instalación eléctrica de baja y media tensión, encargados de llevar la energía desde los aerogeneradores a la subestación de alta tensión. Esta instalación eléctrica se compone de la red de baja tensión en los aerogeneradores, los cables de media tensión y la subestación eléctrica de media tensión con su aparamenta. Una vez conocido todo lo necesario se procedió a realizar un estudio de la obra civil. En este estudio se estudió la adaptación de caminos, cavado de zanjas y cimentación de los aerogeneradores y plataformas de construcción. Posteriormente, se realizó un estudio económico calculando los costes y beneficios del parque eólico para obtener las distintas métricas económicas necesarias para valorar la viabilidad del parque. Por último, se hizo un estudio de contaminación ahorrada por la generación de energía eólica y se vio como el proyecto estaba alineado con los Objetivos de Desarrollo sostenible.es-ES
dc.description.abstractIn this work, an onshore wind farm has been developed in Spain. To select this location, initially, a superficial analysis of three different sites was conducted. After this initial analysis, the site that met the requirements and scored the highest based on a scoring system that evaluated various qualities of the site, such as average wind speed, topography and vegetation, and proximity to a high voltage substation, among others, was selected. Once the site was chosen, an energy study was conducted, comparing 3 wind turbines from different companies and calculating the net energy produced by each, ultimately selecting the one that offered the highest value. Taking into account the losses that exist in the process of transporting energy to the grid, the net energy discharged into the grid was obtained. Once the wind turbines were selected, the entire low and medium voltage electrical installation was developed, responsible for carrying the energy from the wind turbines to the high voltage substation. This electrical installation consists of the low voltage network at the wind turbines, the medium voltage cables, and the medium voltage electrical substation with its equipment. Once everything necessary was known, a civil works study was conducted. This study examined the adaptation of roads, trench digging, and the foundation of the wind turbines and construction platforms. Subsequently, an economic study was performed, calculating the costs and benefits of the wind farm to obtain the various economic metrics needed to assess the viability of the park. Finally, a study of pollution saved by the generation of wind energy was conducted, and it was seen how the project was aligned with the Sustainable Development Goals.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleProyecto de ejecución de un parque eólico terrestre en Españaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsenergía eólica, aerogeneradores, instalación eléctrica, viabilidad económicaes-ES
dc.keywordswind energy, wind turbines, electrical installation, economic viabilityen-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
SIGNED TFG-Javier Silva LopezDEF.pdfTrabajo Fin de Grado6,81 MBAdobe PDFVisualizar/Abrir
signed_AnexoI.pdfAutorización113,55 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.