Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/86298
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMartín Serrano, Javieres-ES
dc.contributor.authorVidal López, Jaimees-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-01-17T10:57:49Z-
dc.date.available2024-01-17T10:57:49Z-
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/86298es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEste proyecto propone e instala un sistema de climatización para un aeropuerto en Murcia, cumpliendo con la normativa vigente. El edificio tiene cuatro plantas y se climatizarán las áreas de facturación, llegadas y salidas, con equipos ubicados en la cubierta. 1. **Cálculo de cargas:** Se estudió la geometría y orientación del edificio para calcular las cargas térmicas en verano e invierno, considerando la normativa RITE que establece 24ºC y 50% de humedad relativa. 2. **Diseño de climatizadores:** Se dimensionaron seis climatizadores de caudal constante (dos por zona), determinando el caudal y la temperatura de impulsión. 3. **Dimensionamiento de conductos y tuberías:** Se calcularon los conductos de impulsión y retorno, y las tuberías para transportar agua fría o caliente, garantizando una velocidad no superior a 7 m/s y una pérdida de carga < 0.12 mm de c.d.a./m. 4. **Planos y documentación:** Se elaboraron los planos de los circuitos, un pliego de condiciones y un presupuesto. El proyecto se alinea con los Objetivos de Desarrollo Sostenible: Industria, Innovación e Infraestructura; Acción por el Clima; Alianzas para Lograr los Objetivos; y Energía Asequible.es-ES
dc.description.abstractThis project proposes and installs a climate control system for an airport in Murcia, complying with current regulations. The building has four floors, and the check-in, arrivals, and departures areas will be climate-controlled, with equipment located on the roof. - **Load Calculation:** The building's geometry and orientation were studied to calculate thermal loads in summer and winter, considering the RITE regulation, which establishes 24ºC and 50% relative humidity. - **Design of Climate Control Units:** Six constant flow climate control units were sized (two per zone), determining the supply flow and temperature. - **Sizing of Ducts and Pipes:** The supply and return ducts were calculated, and the pipes for transporting cold or hot water, ensuring a speed not exceeding 7 m/s and a pressure drop < 0.12 mm of c.d.a./m. - **Plans and Documentation:** Circuit plans, a specification document, and a budget were prepared. The project aligns with the Sustainable Development Goals: Industry, Innovation, and Infrastructure; Climate Action; Partnerships for the Goals; and Affordable Energy.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un aeropuerto localizado en Burgoses_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsCLIMATIZACIÓN AEROPUERTO MURCIAes-ES
dc.keywordsMURCIA AIRPORT CLIMATE CONTROLen-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG_VIDAL_LOPEZ_JAIME.pdfTrabajo Fin de Grado4,39 MBAdobe PDFVisualizar/Abrir
ANEXO I Jaime Vidal Lopez.pdfAutorización69,23 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.