Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/86709
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMartín Serrano, Javieres-ES
dc.contributor.authorYbarra Arana, Diegoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-02-05T14:45:04Z-
dc.date.available2024-02-05T14:45:04Z-
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/86709es_ES
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEl objetivo de este proyecto es diseñar un sistema completo de climatización para un centro acuático ubicado en la ciudad de Cáceres. Este diseño garantizará el cumplimiento de las normativas técnicas y legales vigentes. En primer lugar, será necesario realizar un estudio meteorológico completo de la zona donde se encuentra el centro, para poder seleccionar los equipos necesarios para combatir sus cargas de verano e invierno. Como medida de diseño se diseña la instalación usando como referencia el día más caluroso en verano y el día más frío en invierno. Se establecerán las condiciones de humedad y temperatura para el diseño según las necesidades de cada sala. Las características constructivas del edificio, teniendo en cuenta desde los materiales de construcción hasta la orientación de las distintas estancias dentro del edificio, también serán imprescindibles en este estudio de cargar térmicas. El edificio consta de tres plantas: una planta sótano, una planta baja (a nivel del suelo), y una primera planta. Además, cuenta con una planta bajo cubierta y con una zona de piscina que ocupa la altura total de las tres plantas descritas. Este proyecto se centrará en un estudio detallado de las áreas principales de acceso: un vestíbulo de entrada, una tienda y un parque infantil; y la zona de la piscina, que incluye una piscina de competición de tamaño semiolímpico. Se instalan fan-coils con su climatizador central de tratamiento de aire para las zonas más pequeñas como la tienda y el parque infantil. Son fan-coils de tipo cassette conectados al falso techo ideales para controlar de manera individualizada pequeños recintos. Un climatizador de todo aire exterior se encarga de climatizar toda la zona del vestíbulo debido a su extenso tamaño. Por último, en la zona de la piscina se instalará un desumectador capaz de extraer del local el aire húmedo generado por la evaporación del agua, tratarlo con aire exterior y un ciclo de Carnot para impulsar aire a condiciones optimas de nuevo al local. En total, será necesario gestionar 205,000 W en condiciones de verano y una carga de invierno de 181,000 W. Para la gestión de agua caliente y fría necesaria en los equipos climáticos se emplean bomba de calor de dos tubos, siendo capaces de proporcionar agua caliente en invierno y agua fría en verano. Una bomba de calor suministrará agua únicamente a la deshumectadora de la piscina. Por otro lado, otra bomba gestiona el resto de equipos de climatización. Se ha estimado un presupuesto de material para esta instalación de 170,224.75 €.es-ES
dc.description.abstractThe objective of this project is to design a comprehensive air conditioning system for an aquatic center located in the city of Cáceres. This design will ensure compliance with current technical and legal regulations. Firstly, it will be necessary to conduct a complete meteorological study of the area where the center is located to select the necessary equipment to manage its summer and winter loads. As a design measure, the installation will be designed using the hottest day in summer and the coldest day in winter as references. Humidity and temperature conditions will be established for the design according to the needs of each room. The construction characteristics of the building, considering everything from construction materials to the orientation of the different rooms within the building, will also be essential in this thermal load study. The building consists of three floors: a basement, a ground floor (at ground level), and a first floor. Additionally, it has an attic and a pool area that spans the total height of the three described floors. This project will focus on a detailed study of the main access areas: an entrance lobby, a shop, and a children's play area, as well as the pool area, which includes a semi-Olympic competition pool. Fan-coils with a central air treatment unit will be installed for smaller areas like the shop and the children's play area. These are cassette-type fan-coils connected to the false ceiling, ideal for individually controlling small spaces. An all-outdoor air handler will air condition the entire lobby area due to its large size. Lastly, a dehumidifier will be installed in the pool area, capable of extracting humid air generated by water evaporation, treating it with outdoor air and a Carnot cycle, and then supplying air at optimal conditions back to the area. In total, it will be necessary to manage 205,000 W in summer conditions and a winter load of 181,000 W. For the management of hot and cold water required by the climate control equipment, two-pipe heat pumps will be used, capable of providing hot water in winter and cold water in summer. One heat pump will supply water only to the pool dehumidifier. Another pump will manage the rest of the climate control equipment. A material budget for this installation has been estimated at €170,224.75.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-mecanica (MII-M)es_ES
dc.titleClimatización de un parque acuático en Cácereses_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsClimatizar, deshumectar, cargas termicas, fan-coils, UTA, deshumectadora, piscina, polideportivoes-ES
dc.keywordsTo air condition, to dehumidify, thermal loads, fan-coils, AHU (Air Handling Unit), dehumidifier, pool, and sports center.en-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM_Ybarra Arana, Diego.pdfTrabajo Fin de Máster16,05 MBAdobe PDFVista previa
Visualizar/Abrir
Axexo I DIEGO YBARRA ARANA.pdfAutorización64,74 kBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.