Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/87345
Título : | Response of a nuclear power plant in case of a large power system disturbance |
Autor : | Archilla Martín-Sanz, Jacobo Gavilán Moreno, Carlos Rouco Rodríguez, Luis Ortega Manjavacas, Álvaro |
Resumen : | On July 24, 2021, a disturbance in the French transmission system led to the separation of the Iberian power system from the Continental European power system. The frequency excursion led to the tripping of the under-frequency load-shedding protections in the Iberian power system. Hence, the system exhibited large frequency excursions. This paper reports the response of a Spanish 1092 MW BWR nuclear power plant along with the transient. |
URI : | http://hdl.handle.net/11531/87345 |
Aparece en las colecciones: | Documentos de Trabajo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-22-088C_poster.pdf | 918,57 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.