Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/93982
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSánchez Mingarro, Matías Juanes-ES
dc.contributor.authorArroyo de Lagasca Encinas, Íñigoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-09-12T07:56:22Z-
dc.date.available2024-09-12T07:56:22Z-
dc.date.issued2025es_ES
dc.identifier.urihttp://hdl.handle.net/11531/93982-
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl proyecto consiste en la propuesta de diseño de una subestación transformadora 132/45 kV en el municipio de Bonilla de la Sierra (Ávila). El objetivo es llevar a cabo la autorización administrativa y la tramitación oficial del proyecto mediante la obtención de los permisos necesarios, presentando y justificando las decisiones tomadas para el diseño de la instalación. La subestación facilita la evacuación de energía renovable procedente de los parques solares fotovoltaicos de Cabeza Mesá, El Rincón y Colladillo y de la central hidroeléctrica del Embalse de Santa Teresa, además de enlazarse con las subestaciones de distribución de Piedrahíta y Muñana. Debido a su cercanía a entornos protegidos por la Red Natura 2000 y Parques Regionales se ha realizado un estudio de impacto ambiental que evalúa la afección sobre la biodiversidad y la integración de la subestación sobre el territorio, incorporando medidas de prevención en consonancia con los planes de conservación de Castilla y León. La instalación cuenta con un total de ocho posiciones de líneas, además, hay dos posiciones para los transformadores de potencia, siendo la configuración de ambos parques en doble barra, permitiendo una conexión flexible de los circuitos al poder operar las dos barras colectoras de manera independiente e implementando una tecnología de aislamiento de tipo AIS (Air Insulated Switchgear), ideal para entornos rurales sin restricciones de espacio. El edificio principal de la instalación está equipado con distintas salas dedicadas al control y mando, las comunicaciones y los servicios auxiliares. Los sistemas de protección incluyen las protecciones para las barras, los interruptores y las líneas, y los de seguridad incluyen sistemas de vigilancia anti-intrusión y antiincendios. El presupuesto total de la instalación es de 5.461.988€.es-ES
dc.description.abstractThe project involves the design proposal for a 132/45 kV transformer substation in the municipality of Bonilla de la Sierra (Ávila). The objective is to complete the administrative authorization and official processing of the project by obtaining the necessary permits, presenting and justifying the decisions made for the facility's design. The substation facilitates the evacuation of renewable energy from the Cabeza Mesá, El Rincón, and Colladillo photovoltaic solar farms and the Santa Teresa Reservoir hydroelectric plant, in addition to connecting to the Piedrahíta and Muñana distribution substations. Due to its proximity to environments protected by the Natura 2000 Network and Regional Parks, an environmental impact study has been conducted to assess the impact on biodiversity and the integration of the substation into the territory, incorporating preventive measures in line with the conservation plans of Castilla y León. The facility has a total of eight-line positions, plus two positions for power transformers. Both farms are configured as double busbars, allowing for flexible circuit connection by operating the two busbars independently and implementing AIS (Air Insulated Switchgear) insulation technology, ideal for rural environments with limited space. The facility's main building is equipped with various rooms dedicated to control and command, communications, and auxiliary services. The protection systems include protection for the busbars, switches, and lines, and the security systems include anti-intrusion and fire surveillance systems. The total budget for the facility is €5,461,988.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleProyecto técnico-administrativo de subestación de la red de transporte de energía eléctricaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsSubestación eléctrica, Alta tensión, Red de transporte, 132/45kV, Bonilla de la Sierra, Red Natura 2000es-ES
dc.keywordsElectrical substation, High voltage, Transmission network, 132/45 kV, Bonilla de la Sierra, Natura 2000 Networken-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG_ArroyodeLagascaEncinas,Inigo.pdfTrabajo Fin de Grado5,29 MBAdobe PDFVisualizar/Abrir
Anexo I-ArroyodeLagascaEncinas.Inigo.pdfAutorización127,1 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.