Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/96406
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorBindu, Shilpaes-ES
dc.contributor.authorChaves Ávila, José Pabloes-ES
dc.contributor.authorOlmos Camacho, Luises-ES
dc.contributor.authorGómez San Román, Tomáses-ES
dc.date.accessioned2024-11-26T16:40:38Z-
dc.date.available2024-11-26T16:40:38Z-
dc.identifier.urihttp://hdl.handle.net/11531/96406-
dc.description.abstractes-ES
dc.description.abstractThe Iberian electricity markets use a dedicated congestion management market to address network constraint violations arising from zonal day-ahead market dispatches. This market operates in two phases: the first phase resolves local congestion through redispatch, while the second phase restores the balance between generation and demand. This study evaluates the effectiveness of this two-phase approach in the context of a rapidly evolving energy sector. We identify inefficiencies in the current two-phase DACM model and examine the performance of an alternative approach which involves addressing the imbalances after day-ahead congestion management in the balancing market. Using a nine-node system, we demonstrate that each model has its strengths and weaknesses, depending on predicted system conditions. Our findings suggest that a dynamic market model, which adapts based on real-time predictions, offers the greatest efficiency. This adaptive model effectively addresses the challenges posed by intraday trading and the availability of flexible resources, thereby enhancing overall market performance.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleThe need for system balance restoration after congestion management: an examination of Iberian congestion management marketses_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsCongestion Management, Spanish Electricity Markets, Redispatch, Balancing Markets, Zonal Market Designen-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Tamaño Formato  
IIT-24-250C.pdf420,05 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.