Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/96602Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.advisor | Martín Serrano, Javier | es-ES |
| dc.contributor.author | Cavestany García-Matres, Mario | es-ES |
| dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
| dc.date.accessioned | 2024-12-03T16:15:23Z | - |
| dc.date.available | 2024-12-03T16:15:23Z | - |
| dc.date.issued | 2025 | es_ES |
| dc.identifier.uri | http://hdl.handle.net/11531/96602 | - |
| dc.description | Grado en Administración y Dirección de Empresas y Máster Universitario en Ingeniería Industrial | es_ES |
| dc.description.abstract | Se ha realizado el diseño y dimensionamiento de la instalación de climatización de un hospital en Córdoba, cumpliendo con el RITE y la norma UNE 100713. A partir de las condiciones climáticas y de uso, se efectuó el cálculo de cargas térmicas (423 kW en verano y 203 kW en invierno) y el dimensionamiento de las redes de tuberías y conductos. Posteriormente se llevó a cabo la selección de equipos principales (fancoils, caldera, enfriadora, climatizadores, bombas y elementos de difusión), garantizando confort, eficiencia y fiabilidad. El proyecto concluye con un presupuesto total de 586.967,12 €. | es-ES |
| dc.description.abstract | The design and sizing of the HVAC system for a hospital in Córdoba has been carried out, in compliance with the RITE and UNE 100713 standards. Based on climatic and operational conditions, the thermal load calculations were performed (423 kW in summer and 203 kW in winter), as well as the sizing of the piping and duct networks. Subsequently, the main equipment was selected (fan-coils, boiler, chiller, air handling units, pumps, and air distribution elements), ensuring comfort, efficiency, and reliability. The project concludes with a total budget of €586,967.12. | en-GB |
| dc.format.mimetype | application/pdf | es_ES |
| dc.language.iso | es-ES | es_ES |
| dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
| dc.subject.other | H62-mecanica (MII-M) | es_ES |
| dc.title | Climatización de un Hospital en la ciudad de Córdoba | es_ES |
| dc.type | info:eu-repo/semantics/masterThesis | es_ES |
| dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
| dc.keywords | Climatización, Hospital, Córdoba | es-ES |
| dc.keywords | HVAC, Hospital, Córdoba | en-GB |
| Aparece en las colecciones: | H62-Trabajos Fin de Máster | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| TFM Cavestany Garcia-Matres, Mario.pdf | Trabajo Fin de Máster | 10,41 MB | Adobe PDF | Visualizar/Abrir |
| AnexoI Cavestany Mario.pdf | Autorización | 89,78 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.