Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/98164
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorFernández García, María Mercedeses-ES
dc.contributor.authorGarcía-Larrache Segura, Jaimees-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2025-03-20T18:59:02Z-
dc.date.available2025-03-20T18:59:02Z-
dc.date.issued2025es_ES
dc.identifier.urihttp://hdl.handle.net/11531/98164-
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl presente Trabajo de Fin de Grado analiza de forma integral la viabilidad técnica, económica, ambiental y estratégica del Parque Eólico Gecama, situado en Cuenca, el mayor parque eólico terrestre construido en una sola fase en España. Con una potencia instalada de 312 MW, distribuida en 69 aerogeneradores de última generación, el parque alcanza una producción estimada de 1.050 GWh anuales, suficiente para abastecer a más de 280.000 hogares. Desde el punto de vista económico-financiero, se emplearon indicadores clave como el Valor Actual Neto (VAN), la Tasa Interna de Retorno (TIR), el Payback y el Coste Nivelado de la Energía (LCOE). Los resultados confirman una elevada rentabilidad, con un VAN positivo de +160 M€, una TIR del 10,8 %, un periodo de retorno de 10–12 años y un LCOE competitivo de 38 €/MWh. En términos ambientales y sociales, el proyecto evita la emisión de 350.000 toneladas de CO₂ al año, lo que equivale a retirar 230.000 vehículos de la circulación, y ha generado más de 2.000 empleos directos e indirectos en su fase de construcción, contribuyendo al desarrollo económico local. El análisis estratégico, basado en herramientas como DAFO, CAME, PESTEL, Porter y McKinsey 7S, confirma la solidez del proyecto frente a riesgos de mercado y regulatorios. Además, el parque se alinea con los Objetivos de Desarrollo Sostenible (ODS), en especial los ODS 7, 8, 9, 11, 13 y 15. En conjunto, este trabajo demuestra que el Parque Eólico Gecama constituye un caso de éxito extrapolable, consolidándose como un proyecto rentable, sostenible y estratégico en el proceso de transición energética en España.es-ES
dc.description.abstractThis Final Degree Project provides a comprehensive analysis of the technical, economic, environmental, and strategic feasibility of the Gecama Wind Farm, located in Cuenca, the largest onshore wind farm built in a single phase in Spain. With an installed capacity of 312 MW across 69 state-of-the-art turbines, the farm achieves an estimated annual generation of 1,050 GWh, enough to supply more than 280,000 households. From a financial perspective, key indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period, and Levelized Cost of Energy (LCOE) were calculated. Results confirm the project’s strong profitability, with a positive NPV of +€160 million, an IRR of 10.8%, a payback period of 10–12 years, and a competitive LCOE of €38/MWh. In terms of environmental and social impact, the project prevents 350,000 tons of CO₂ emissions annually—equivalent to removing 230,000 cars from the road—and has created over 2,000 direct and indirect jobs during its construction, boosting local economic development. The strategic analysis, using tools such as SWOT, CAME, PESTEL, Porter’s Five Forces, and McKinsey 7S, highlights the project’s resilience against market volatility and regulatory risks. Furthermore, the wind farm is strongly aligned with the United Nations Sustainable Development Goals (SDGs), particularly SDGs 7, 8, 9, 11, 13, and 15. Overall, this study demonstrates that the Gecama Wind Farm is an exemplary success case, positioning itself as a profitable, sustainable, and strategic project within Spain’s energy transition.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-organizacion (GITI-O)es_ES
dc.titleBusiness Case: Análisis de la viabilidad económica de un parque eólico.es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsEnergía eólica, Viabilidad económica, Estrategia, Transición energética, Desarrollo sostenible.es-ES
dc.keywordsWind energy, Economic viability, Strategy, Energy transition, Sustainable development.en-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG-Garcia-LarracheSegura,Jaime.pdfTrabajo Fin de Grado1,79 MBAdobe PDFVisualizar/Abrir
AnexoI_TFG_JaimeGarcia-Larrache.pdfAutorización126,52 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.