Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/98285
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCarrasco Andrés, Fideles-ES
dc.contributor.authorPrados Escolar, José Luises-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2025-03-26T07:04:12Z-
dc.date.available2025-03-26T07:04:12Z-
dc.date.issued2026es_ES
dc.identifier.urihttp://hdl.handle.net/11531/98285-
dc.descriptionGrado en Administración y Dirección de Empresas y Máster Universitario en Ingeniería Industriales_ES
dc.description.abstractEl presente proyecto tiene como objetivo el diseño y cálculo de una nave industrial destinada a albergar un cebadero de terneras mansas, junto con el estudio energético necesario para garantizar el abastecimiento eléctrico de la instalación. El proyecto se desarrolla en el término municipal de Lanzahíta (Ávila), en la finca Monte Valdetiétar, y surge de la necesidad de sustituir un cebadero antiguo y en mal estado por una nueva infraestructura moderna, segura y eficiente. La nave proyectada tiene unas dimensiones aproximadas de 38 metros de ancho, 100 metros de largo y pilares de 6 metros de altura, y se construye con estructura metálica de acero laminado, cimentación de hormigón armado y cerramiento mediante panel sándwich, garantizando el bienestar del ganado. A nivel estructural, se han realizado los cálculos de resistencia y flecha pertinentes y se han dimensionado los distintos elementos que componen la nave (vigas, correas, pilares, celosías, arriostramientos, placas de anclaje, pernos de anclaje y cimentación) obteniendo una estructura segura y óptima en el uso de materiales. En cuanto al suministro energético, se estudiaron dos alternativas: una instalación de biogás y otra fotovoltaica. Tras el análisis comparativo, la opción fotovoltaica fue seleccionada por su viabilidad técnica y económica. A nivel económico, se ha realizado un estudio de los costes de construcción de la nave industrial, obteniendo su coste normalizado y lo mismo se ha realizado para la instalación fotovoltaica, de la que además se ha calculado la rentabilidad, resultando ser una instalación rentable gracias al ahorro energético anual que supone. El trabajo demuestra la posibilidad de integrar ingeniería estructural y energías renovables en el ámbito ganadero, ofreciendo una solución técnica, eficiente y respetuosa con el medio rural.es-ES
dc.description.abstractThe present project aims to design and calculate an industrial building intended to house a heifer fattening facility, along with the corresponding energy study required to ensure the electrical supply of the installation. The project is located in the municipality of Lanzahíta (Ávila), on the Monte Valdetiétar estate, and arises from the need to replace an old and deteriorated fattening facility with a new, modern, safe, and efficient infrastructure. The designed building has approximate dimensions of 38 meters in width, 100 meters in length, and 6-meter-pillars, and is constructed with a laminated steel structure, reinforced concrete foundations, and sandwich panel cladding, ensuring animal welfare. From a structural standpoint, resistance and deflection calculations have been carried out, and all the components of the building (beams, purlins, pillars, lattices, bracings, anchor plates, anchor bolts, and foundations) have been dimensioned, resulting in a safe and material-efficient structure. Regarding the energy supply, two alternatives were studied: a biogas system and a photovoltaic installation. After a comparative analysis, the photovoltaic option was selected due to its technical and economic feasibility. From an economic perspective, a study of the construction costs of the industrial building was performed, obtaining its normalized cost, and the same analysis was carried out for the photovoltaic installation, for which profitability was also calculated. The results show that the photovoltaic system is economically viable thanks to the annual energy savings achieved. The work demonstrates the feasibility of integrating structural engineering and renewable energy systems within the livestock sector, offering a technical, efficient, and environmentally responsible solution for the rural environment.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-mecanica (MII-M)es_ES
dc.titleConstrucción de una nave industrial para un cebadero de terneras y su abastecimientoenergéticoes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsCebadero; nave industrial; estructura; electricidad; consumo; producción.es-ES
dc.keywordsFattening facility; industrial building; structure; electricity; consumption; production.en-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Anexo I.pdfAutorización74,07 kBAdobe PDFVisualizar/Abrir     Request a copy
TFM - Prados Escolar, José Luis.pdfTrabajo Fin de Máster7,29 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.