dc.description.abstractEste trabajo analiza la inversión de Ahorro Corporación en el Metro Ligero Oeste (MLO), una concesión de transporte urbano en la zona oeste de Madrid, siguiendo el ciclo completo de un fondo de infraestructuras: entrada, gestión y salida. La pregunta de investigación es la siguiente: ¿qué factores determinaron el éxito de la inversión de Ahorro Corporación en el MLO, analizados a través del ciclo completo de un fondo de infraestructuras? A partir de documentación interna original: contratos, modelo financiero de firma, estados financieros y documentación del proceso de desinversión, el trabajo examina cómo se estructuró la inversión inicial mediante un esquema de Project Finance y colaboración público-privada, cómo evolucionó el activo durante su fase de explotación y en qué condiciones se produjo la salida. El análisis muestra que la demanda real durante los primeros cinco años de operación se situó sistemáticamente por debajo del 45% de las proyecciones del caso base, lo que obligó a activar el mecanismo de reequilibrio contractual, el Rendimiento Mínimo de Demanda (RMD), en septiembre de 2011. A partir de ese momento el perfil de riesgo del activo cambió radicalmente, lo que permitió ejecutar la desinversión en diciembre de 2012 con una TIR neta del 9% y un múltiplo de equity de 1,65x, por encima del valor que el mercado asignaba a esa participación en ese momento. El trabajo concluye que el éxito de la inversión no se basó en acertar con las proyecciones de demanda, sino en haber diseñado desde el inicio una estructura financiera con suficiente profundidad para sobrevivir un escenario adverso prolongado.es-ES
dc.description.abstractThis paper analyses Ahorro Corporación's investment in the Metro Ligero Oeste (MLO), a light rail concession serving the western municipalities of Madrid, following the complete investment cycle of an infrastructure fund: entry, asset management and exit. The research question addressed is: what factors determined the success of Ahorro Corporación's investment in the MLO, analysed through the full cycle of an infrastructure fund? Drawing on original internal documentation: including the concession contract, the financial close model, annual accounts and divestment records, the paper examines how the initial investment was structured using Project Finance and a public-private partnership framework, how the asset performed during its operational phase relative to initial projections, and under what conditions the divestment took place. The analysis shows that actual ridership during the first five years of operation was consistently below 45% of base case projections, which required the activation of the contractual minimum demand guarantee in September 2011. From that point, the risk profile of the asset changed fundamentally, enabling a divestment in December 2012 at a net IRR of 9% and an equity multiple of 1.65x, significantly above the market value assigned to the stake at that time. The paper concludes that the success of the investment did not stem from accurate demand forecasting, but from having designed at the outset a financial structure with sufficient depth to withstand a prolonged adverse scenario.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherK21es_ES
dc.titleLa vida completa de una concesión de transporte: financiación, estructura y desinversión en el caso Metro Ligero Oestees_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsPalabras clave: inversión en infraestructuras, Project Finance, colaboración público- privada, fondo de capital riesgo, desinversión, concesión de obra pública, Metro Ligero Oeste.es-ES
dc.keywordsKeywords: infrastructure investment, Project Finance, public-private partnership, private equity fund, divestment, public works concession, Metro Ligero Oeste.en-GB


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 United States
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 United States