• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Sizing of Battery Storage Systems to Mimic the Operation of RES-based VPPs in Electricity Markets

Thumbnail
View/Open
IIT-25-060C.pdf (2.048Mb)
Date
2025-07-07
Author
Nemati, Hadi
Sánchez Martín, Pedro
Sigrist, Lukas
Rouco Rodríguez, Luis
Ortega Manjavacas, Álvaro
Estado
info:eu-repo/semantics/publishedVersion
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
The presence of large-scale Battery Energy Storage Systems (BESSs) in the grid is increasing at a quick pace, mainly to facilitate the process of the also increasing penetration of Renewable Energy Sources (RESs). However, BESSs are not exempt from caveats and limitations. In this regard, the interest in coordinating already installed resources in the form of RES-only Virtual Power Plant (RVPP) for energy market participation and ancillary services provision is rapidly growing. This paper determines the size of BESS needed to achieve similar economic performance as an RVPP in the energy and ancillary service markets for different levels of uncertainty and weather conditions. Uncertainties related to electricity markets, as well as RVPP RES units and demands, are considered in the RVPP optimization problem.
 
The presence of large-scale Battery Energy Storage Systems (BESSs) in the grid is increasing at a quick pace, mainly to facilitate the process of the also increasing penetration of Renewable Energy Sources (RESs). However, BESSs are not exempt from caveats and limitations. In this regard, the interest in coordinating already installed resources in the form of RES-only Virtual Power Plant (RVPP) for energy market participation and ancillary services provision is rapidly growing. This paper determines the size of BESS needed to achieve similar economic performance as an RVPP in the energy and ancillary service markets for different levels of uncertainty and weather conditions. Uncertainties related to electricity markets, as well as RVPP RES units and demands, are considered in the RVPP optimization problem.
 
URI
http://hdl.handle.net/11531/105296
Sizing of Battery Storage Systems to Mimic the Operation of RES-based VPPs in Electricity Markets
Tipo de Actividad
Capítulos en libros
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave
Battery energy storage systems, renewable-only virtual power plant, electricity market, uncertainty.
Battery energy storage systems, renewable-only virtual power plant, electricity market, uncertainty.
Collections
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback