A reduced-order model for simulation of back-to- back start-up of synchronous motors in pumped storage hydropower plants
View/ Open
Date
2024-08-05Estado
info:eu-repo/semantics/publishedVersionMetadata
Show full item recordAbstract
This paper proposes a reduced-order model for the simulation of back-to-back start-up of synchronous motors in pumped storage hydropower plants aimed at calculating the starting time of the generator-motor set. It is assumed that the back-to-back start-up process is governed by a predefined gate set point-time profile to the governor of the synchronous generator. Simulation of detailed and reduced-order models arecompared. Sensitivity analysis with respect to the parameters of the gate set point-time profile is presented. This paper proposes a reduced-order model for the simulation of back-to-back start-up of synchronous motors in pumped storage hydropower plants aimed at calculating the starting time of the generator-motor set. It is assumed that the back-to-back start-up process is governed by a predefined gate set point-time profile to the governor of the synchronous generator. Simulation of detailed and reduced-order models arecompared. Sensitivity analysis with respect to the parameters of the gate set point-time profile is presented.
A reduced-order model for simulation of back-to- back start-up of synchronous motors in pumped storage hydropower plants
Tipo de Actividad
Capítulos en librosMaterias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)Palabras Clave
Pumped-storage power plants, Fixed-speed synchronous machines, back-to-back start-up, detailed model, reduced-order model.Pumped-storage power plants, Fixed-speed synchronous machines, back-to-back start-up, detailed model, reduced-order model.

