• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Coupled electromechanical cost optimization of high speed railway overheads

Thumbnail
Ver/
IIT-06-122C.pdf (5.128Mb)
Fecha
2006-05-22
Autor
Jiménez Octavio, Jesús Ramón
Pilo De La Fuente, Eduardo
López García, Óscar
Carnicero López, Alberto
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
This paper presents a coupled electromechanical optimization of the cost of high speed railway overheads. The proposed electromechanical optimization solves the coupled mechanical and electrical problems by obtaining the railway overhead with minimum cost. A simple model cost of the railway overhead is proposed. This model cost defines the global cost per kilometer, which is mainly composed by the costs of material used in the construction of the overhead supports and the electric lines respectively. Using a standard genetic algorithm the optimized railway overhead is obtained. The parameters which describe the railway overhead are defined by: (i) sizing and (ii) configuration of the overhead supports; (iii) geometric location and (iv) type of electric conductors. The constraints considered are: (i) maximum allowable stress, and (ii) structural static stability; (iii) structure gauge to limit the position of physical conductors, (iv) minimum distance between conductors or between conductor and earth and (v) maximum allowable current of each conductor. In addition, the fitness function also considers the minimization of the equivalent electrical system impedance as a secondary optimization criterion. This optimization method has been successfully applied to the design of the high speed railway overhead C-350, used in the new line Madrid-Barcelona-French Border. The optimized railway overhead shows an overall improvement at two levels. Firstly the performance is enhanced and secondly the global cost is reduced. The obtained results are compared with the non-optimized configuration in order to demonstrate the obtained improvements.
 
URI
http://hdl.handle.net/11531/105439
Coupled electromechanical cost optimization of high speed railway overheads
Tipo de Actividad
Capítulos en libros
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

No disponibleNot available
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias