Mostrar el registro sencillo del ítem

dc.contributor.authorVallés Rodríguez, Mercedeses-ES
dc.contributor.authorReneses Guillén, Javieres-ES
dc.contributor.authorCossent Arín, Rafaeles-ES
dc.contributor.authorFrías Marín, Pabloes-ES
dc.date.accessioned2016-11-04T04:06:10Z
dc.date.available2016-11-04T04:06:10Z
dc.date.issued2016-11-01es_ES
dc.identifier.issn0378-7796es_ES
dc.identifier.urihttps://doi.org/10.1016/j.epsr.2016.04.026es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractImproving electricity demand response (DR) to support the operation and planning of distribution networks is an essential component of the European Commission strategy to increase economic efficiency in electric power systems across Europe. Due to the lack of the appropriate infrastructure, end consumers have traditionally been blind to wholesale market conditions as well as from the real costs they cause on the network and the power system operation. With the recent deployment of smart metering and communication technologies, provided an appropriate regulatory environment exists, new forms of local DR involving distribution system operators and small consumers could be developed. In a context where many EU Member States are still in the process of opening their retail sectors up to competition and being any active distribution management procedures still to be defined, DR is materializing at a very slow rate. It is the role of regulators to provide a suitable regulatory framework to allow DR to become effective at distribution level. This paper revises the main regulatory barriers that slow down the successful development of demand response mechanisms addressed to small consumers and an active distribution network management across Europe. In order to illustrate this discussion, an overview of six particular national examples is provided: France, Germany, Italy, Spain, Great Britain and Sweden. Finally, recommendations for policy makers and regulators are given.es-ES
dc.description.abstractImproving electricity demand response (DR) to support the operation and planning of distribution networks is an essential component of the European Commission strategy to increase economic efficiency in electric power systems across Europe. Due to the lack of the appropriate infrastructure, end consumers have traditionally been blind to wholesale market conditions as well as from the real costs they cause on the network and the power system operation. With the recent deployment of smart metering and communication technologies, provided an appropriate regulatory environment exists, new forms of local DR involving distribution system operators and small consumers could be developed. In a context where many EU Member States are still in the process of opening their retail sectors up to competition and being any active distribution management procedures still to be defined, DR is materializing at a very slow rate. It is the role of regulators to provide a suitable regulatory framework to allow DR to become effective at distribution level. This paper revises the main regulatory barriers that slow down the successful development of demand response mechanisms addressed to small consumers and an active distribution network management across Europe. In order to illustrate this discussion, an overview of six particular national examples is provided: France, Germany, Italy, Spain, Great Britain and Sweden. Finally, recommendations for policy makers and regulators are given.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Electric Power Systems Research, Periodo: 1, Volumen: online, Número: , Página inicial: 689, Página final: 698es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleRegulatory and market barriers to the realization of demand response in electricity distribution networks: a European perspectivees_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsDemand response; electricity distribution; regulatory barriers; Europe.es-ES
dc.keywordsDemand response; electricity distribution; regulatory barriers; Europe.en-GB


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem