Mostrar el registro sencillo del ítem

dc.contributor.authorBáñez Chicharro, Fernandoes-ES
dc.contributor.authorOlmos Camacho, Luises-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.contributor.authorLatorre Canteli, Jesús Maríaes-ES
dc.date.accessioned2016-12-01T04:06:56Z
dc.date.available2016-12-01T04:06:56Z
dc.date.issued2017-01-01es_ES
dc.identifier.issn0360-5442es_ES
dc.identifier.urihttps:doi.org10.1016j.energy.2016.10.135es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThis paper proposes a novel methodology to estimate the benefits produced by transmission expansion projects that are part of an expansion plan. Any methodology applied should be coherent with the technical and economic principles that underlie an efficient planning of the network expansion, where expansion projects are selected to be part of the plan according to the benefit they produce when considered jointly with the rest of projects. The methodology developed is based on the idea that projects to be undertaken should be evaluated jointly, instead of individually, because the benefits produced by each of them depend on other projects in the plan. We formulate a cooperative game to allocate the benefits of the plan to individual projects using the Aumann-Shapley concept. Then, players in the game are expansion projects. The method proposed is able to capture interactions among projects. Moreover, it is highly computationally efficient and therefore can be applied to real –large– expansion plans. Two case studies are used to compare the performance of the methodology proposed to that of existing methods. The results show that the proposed methodology provides regulatory authorities with the most relevant information for the identification of high-priority expansion projects.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 1044, Página final: 1054es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleEstimating the benefits of transmission expansion projects: an Aumann-Shapley approaches_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsAumann-Shapley; Cooperative game theory; Cost-benefit analysis; Investment; Transmission expansion planningen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem