dc.description.abstractRegulatory reforms of the power sectors in South America have always been driven by the need of attracting enough investment to guarantee an expansion rate capable of covering the fast-paced demand growth in the continent. In order to achieve this objective, in the last decade several countries in the region have reshaped their regulatory frameworks in the direction of long-term auctioning. This paper first provides a detailed description of the regulatory evolution that resulted in the implementation of auction schemes and then it presents an updated review of the mechanisms implemented in five South American countries, comparing their main design elements.es-ES
dc.description.abstractRegulatory reforms of the power sectors in South America have always been driven by the need of attracting enough investment to guarantee an expansion rate capable of covering the fast-paced demand growth in the continent. In order to achieve this objective, in the last decade several countries in the region have reshaped their regulatory frameworks in the direction of long-term auctioning. This paper first provides a detailed description of the regulatory evolution that resulted in the implementation of auction schemes and then it presents an updated review of the mechanisms implemented in five South American countries, comparing their main design elements.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy Sources Part B: Economics, Planning and Policy, Periodo: 1, Volumen: online, Número: 12, Página inicial: 1103, Página final: 1110es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleThe evolution of electricity auctions in South Americaes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsCapacity mechanisms, electricity auctions, long-term electricity contract, system adequacyes-ES
dc.keywordsCapacity mechanisms, electricity auctions, long-term electricity contract, system adequacyen-GB


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem