Mostrar el registro sencillo del ítem

dc.contributor.advisorCepeda Fernández, Fernando
dc.contributor.authorGreciano Andrés, Marta
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2017-03-14T11:11:55Z
dc.date.available2017-03-14T11:11:55Z
dc.date.issued2016
dc.identifier.urihttp://hdl.handle.net/11531/17535
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEl objetivo de este proyecto consiste en la climatización de un hotel, situado en el centro de Madrid, teniendo en cuenta las condiciones técnicas y legales a las que deberán ajustarse las instalaciones de climatización. Estas instalaciones comprenden la totalidad de los sistemas de refrigeración y climatización necesarios durante todos los días del año. Las instalaciones de climatización se han diseñado para conseguir mantener las condiciones de confort en el interior del edificio. Estas condiciones serán 25ºC +/-1ºC en verano y con una humedad relativa del 50%, y 21ºC en invierno. Partiendo de las condiciones externas más desfavorables para cada época del año se ha diseñado el sistema de climatización. El edificio tiene una superficie total de 7495,76 m2 repartidos en varios restaurantes y cafeterías, aseos, gimnasio, recepción y 225 habitaciones. Esta superficie se divide en 22 alturas (incluyendo las cuatro plantas subterráneas) más la cubierta. Tras el estudio de la ubicación y orientación se han calculado las cargas de verano y las pérdidas de invierno teniendo en cuenta todas las características constructivas del hotel (coeficientes de trasmisión), condiciones exteriores (ubicación, orientación, condiciones climatológicas), actividades llevadas a cabo en el interior (uso de equipos, iluminación, número de ocupantes…) y las condiciones deseadas en el interior.es_ES
dc.description.abstractThe objective of this project is the air conditioning of a hotel, located at the city center, taking into account the legal and technical conditions to be met by the air conditioning systems. These facilities include all the refrigeration and air conditioning systems required for every day of the year. The air conditioning systems are designed to be able to maintain comfort conditions inside the building. These conditions are 25°C +/-1°C in summer and a relative humidity of 50%, and 21°C in winter. Based on the most unfavorable external conditions for each season, it has be designed the HVAC system. The building has a total area of 7495.76 m2 spread over several restaurants and cafeterias, toilets, gym, reception and 225 rooms. This surface is divided into 22 heights (including the four underground floors) plus the cover. After studying the location and orientation, summer loads and winter losses are calculated taking into account all hotel constructive features (coefficients of transmission), external conditions (location, orientation, weather conditions), activities carried out inside (using equipment, lighting, number of occupants...) and the desired conditions inside.es_ES
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoeses_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/*
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicaes_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject3305 Tecnología de la construcciónes_ES
dc.subject330517 Edificios industriales y comercialeses_ES
dc.titleClimatización de un hotel en Madrides_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States